Existing Transit
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Amanda Tullos on
Can someone please clarify, for infill projects under 125 acres with existing transit, does the project require access to multiple transit types? The credit language seems to request this.
Responsible party for preparing M&V plan
NC-2009 EAc5:Measurement and Verificationposted by Becky Dix on
What are the pros and cons of having either the MEP engineers or the CxA be responsible for documenting the M&V plan?
Controller efficiency factor (CE)
NC-2009 WEc1:Water Efficient Landscapingposted by Ricardo Sá on
During a certification process I have found an electronic irrigation controller (model Hunter Pro-C) that is equipped also with a rain sensor (model Hunter Rain-Click).
ND standard vs the NC standard
ND-v2009 GIBp4:Construction activity pollution preventionposted by Amanda Tullos on
Any idea how the 2003 EPA Construction General Permit (Phase I and I NPDES) required in LEED-NC compares to the Washing State Department of Ecology's Stormwater Management Manual requirement for th
Mini-split efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Leandro Silva on
We are having trouble verifying the efficiency compliance of mini-split air conditioners available in Brazil. They are rated in COP where ASHRAE requirements are stated in SCOP.
Dedicated exhaust in areas of chemical storage- Janitor's closet
EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Programposted by Karin Wohlert on
LEED EBOM does not appear to have any credit that requires direct exhaust areas that store chemicals such as a Janitor's closet might contain.
Automated Demand Response
CS-2009 EAp2:Minimum Energy Performanceposted by Ryan McEvoy on
We are working on a project that is participating in automated demand response. Due to EAc1 points being based on cost savings I want to model this appropriately.
Treated water for landscaping
EBOM-2009 WEc3:Water Efficient Landscapingposted by Manasi Kulkarni on
Our project has installed water meters for Irrigation just recently at the start of performance period. The project uses 100% of treated water for Irrigation which is metered.
why the distance between the
NC-2009 SSc1:Site Selectionposted by sujata shakya on
why the distance between the previously undeveloped land and a water body is taken 50 feet???? can u more elaborate the reason why the distance is being taken 50 feet......
Infrequent Transient Loads
NC-2009 PIf3:Occupant and Usage Dataposted by Allison Zuchman on
I am working on a high school project. I have a few questions on how to list transient occupant load for spaces with high occupancy but that are used infrequently.