Existing Transit

ND-v2009 SLLc3:Locations with reduced automobile dependence
posted by  Amanda Tullos  on 

Can someone please clarify, for infill projects under 125 acres with existing transit, does the project require access to multiple transit types? The credit language seems to request this.

1
Wed Mar 27, 2013, 2:40 pm

Responsible party for preparing M&V plan

NC-2009 EAc5:Measurement and Verification
posted by  Becky Dix  on 

What are the pros and cons of having either the MEP engineers or the CxA be responsible for documenting the M&V plan?

1
Wed Apr 10, 2013, 2:34 pm

Controller efficiency factor (CE)

NC-2009 WEc1:Water Efficient Landscaping
posted by  Ricardo Sá  on 

During a certification process I have found an electronic irrigation controller (model Hunter Pro-C) that is equipped also with a rain sensor (model Hunter Rain-Click).

0

ND standard vs the NC standard

ND-v2009 GIBp4:Construction activity pollution prevention
posted by  Amanda Tullos  on 

Any idea how the 2003 EPA Construction General Permit (Phase I and I NPDES) required in LEED-NC compares to the Washing State Department of Ecology's Stormwater Management Manual requirement for th

1
Thu Mar 28, 2013, 3:01 pm

Mini-split efficiency

NC-2009 EAp2:Minimum Energy Performance
posted by  Leandro Silva  on 

We are having trouble verifying the efficiency compliance of mini-split air conditioners available in Brazil. They are rated in COP where ASHRAE requirements are stated in SCOP.

1
Mon Apr 1, 2013, 8:33 pm

Dedicated exhaust in areas of chemical storage- Janitor's closet

EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Program
posted by  Karin Wohlert  on 

LEED EBOM does not appear to have any credit that requires direct exhaust areas that store chemicals such as a Janitor's closet might contain.

1
Thu Apr 4, 2013, 9:52 pm

Automated Demand Response

CS-2009 EAp2:Minimum Energy Performance
posted by  Ryan McEvoy  on 

We are working on a project that is participating in automated demand response. Due to EAc1 points being based on cost savings I want to model this appropriately.

1
Mon Apr 1, 2013, 12:09 am

Treated water for landscaping

EBOM-2009 WEc3:Water Efficient Landscaping
posted by  Manasi Kulkarni  on 

Our project has installed water meters for Irrigation just recently at the start of performance period. The project uses 100% of treated water for Irrigation which is metered.

1
Mon Apr 1, 2013, 6:43 pm

why the distance between the

NC-2009 SSc1:Site Selection
posted by  sujata shakya  on 

why the distance between the previously undeveloped land and a water body is taken 50 feet???? can u more elaborate the reason why the distance is being taken 50 feet......

1
Mon Apr 1, 2013, 1:50 pm

Infrequent Transient Loads

NC-2009 PIf3:Occupant and Usage Data
posted by  Allison Zuchman  on 

I am working on a high school project. I have a few questions on how to list transient occupant load for spaces with high occupancy but that are used infrequently.

1
Wed Apr 24, 2013, 6:08 pm