EXTRACTION DUCTS AND FANS
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Michael E. Edmonds-Bauer on
This might sound obvious, but we wanted to double check. Regarding underground parking encloused parking (no natural ventilation at all), there always will be fans to "push" the air towards the ex
LEED Retail-CI Restaurant Furniture
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Linda Davisson on
As there is not yet a place to pose a question for Retail-CI, I am hoping someone might still be able to provide confirmation on our team's approach to documenitng the furniture in our project.
Logging Sealants / Adhesives on LEED Form
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Catherine Blakemore on
I have some sealants and adhesives that are being submitted under Division 06 and 12. Should they just be listed once on the LEED form chart?
Project of 2 buildings in one territory
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laurence Theriault on
I am working on a project who has two buildings in his land, but only one of them (an office building) will be in the process of becoming LEED NC.
Commercial kitchen cooling equipment
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Mathilda Jonsson on
There are no refrigerants used in my project building for the HVAC&R-system.
Core&Shell Process Load on a Manufacturing Facility
CS-2009 EAp2:Minimum Energy Performanceposted by Lourdes Salinas on
Hi everyone, We have a C&S Major Renovation Manufacturing Facility project. The building is doubling in size and some adjustments will be performed to the envelope of the existing building.
Documents/ details needed for alternative compliance path
NC-2009 EAp3:Fundamental Refrigerant Managementposted by Mark Meaders on
We have a project with a central plant with chillers that has R-11 refrigerant.
Trace Modeling for Carrier Infinity-V speed heat pumps ??
NC-2009 EAc1:Optimize Energy Performanceposted by Robert Sutton on
Planning to use Carrier variable speed heat pumps split systems on a project and I am looking for data files to assist in this. The manufacturer rep is not aware of anything that can help.
waterless urinals
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Emmanuel Pauwels on
We have tried to comply with this credit using waterless urinals and dual flush toilets with a very low flush (3L/435L)
Existing Parking conditions
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by John Stouffer on
The existing conditions of the site have 55 existing parking spaces. Our plans show that we are taking out 14 parking spaces and adding 16 addition spaces, totaling 71 parking spaces.