NC-2009 EAp2:Minimum Energy Performanceposted by Marco Antonio on
Hello We are developing a project of air conditioning a building certified LEED NC 2.2 and wonder if all Fancoletes and fans small (about 200), should be interlidados in the building automation sys
Adjoining Historic Buildings
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Brownsville Area Revitalization Corporation on
We are working to restore two commercial/residential historic buildings with the intent of achieving LEED certification.
Regional industrial practices
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, I am facing a problem meeting the eap2 credit since my project presents almost 80% energy cost related to process.
Determining FTE, PTE
NC-2009 PIf3:Occupant and Usage Dataposted by Catherine Blakemore on
How are the FTE and PTE numbers derived? The project is for a surgical addition.
Space listings & supporting documentation
Healthcare-v2009 IEQc2:Acoustic environmentposted by Catherine Blakemore on
I am not familiar with this credit so bare with me. Does each space (room) have be be listed on the IEQc2 form? Is there spread sheet format that can be used? Any recommendations will be greatly
LEED for Multi-Family Homes Bicycle Security
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Nicole Koedyker on
For the bike storage at this location, our intent is to create closets similar that can be locked, which would certainly meet this requirement.
Building Reuse
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Tristan Hughes on
Hi All I am new to LEED so please excuse me if this question is a little simple. We are building a new office building on the side of an existing office, and the new office is more then 2 times the
Cost of a whole building LCA and providers?
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by rw speer on
Is there a list somewhere of service providers that will do an LCA on your building? What do they charge?
Changing rooms
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by MARIA GARCIA on
Hi all, We have the showers of the project inside the ADA bathroom due to lack of space in the project.
Gross Area=Regularly occuppied + Unconditioned
NC-2009 PIf3:Occupant and Usage Dataposted by Alicia Villanueva on
We've been requested be the reviewer that the sum of regularly occuppied areas plus the unconditioned spaces mus be equal to the total gross area. We have not been requested this issue in previous