Occupancy rates

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Nelina Loiselle  on 

I am not sure why it says on the documentation screen shot that the total occupancy for the VRP calcs should be consistent with occupancy for other credits.

1
Thu Apr 11, 2013, 7:49 pm

Evapotranspiration rate units?

NC-2009 WEc1:Water Efficient Landscaping
posted by  Erin Holdenried  on 

What is the evapotranspiration rate unit? Inches per day?

1
Sat May 27, 2017, 2:32 am

Trips for survey nonrespondents in option3

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Patricia Fuertes  on 

Good afternoon, We have conducted a survey with option 3 for 21 regular building occupants but there is two peoplo that have not answer to the survey because they were sick.

1
Tue Apr 23, 2013, 9:29 pm

IEQ Space Matrix Version Applicability

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Matthew Macko  on 

For a multifamily project registered in October 2012 should we expect living rooms to be considered multi-occupant relaxation spaces requiring varied lighting control options as described in the Ju

1
Fri Apr 12, 2013, 4:13 am

Do non-regularly occupied spaces have to be air tested?

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  David Groseclose  on 

Hello, if you go for option 2, and conduct an air testing in a lab building, do you also need to do the testing in Non- Regularly occupied spaces, such as carpark, toilets, mechanical rooms, etc?

1
Wed May 1, 2013, 2:24 am

Heat Island Effect - Nonroof in a Zero-Lot Building

CS-2009 SSc7.1:Heat Island Effect—Nonroof
posted by  Raquel Clemente  on 

We are working in the renovation of a zero-lot building in a city center, so the building footprint occupies all the construction site, we don't have site hardscape.

1
Fri Apr 12, 2013, 3:42 pm

WEc3 & WEc2 linked?

NC-2009 WEc3:Water Use Reduction
posted by  Faith Wilbert  on 

I have completed the form for WEp1 & WEc2. When I go to finish WEc3 it doesn't show the savings from the rainwater harvesting with the flush fixtures.

1
Mon Apr 15, 2013, 6:41 pm

Current Regs?

Pilot-Credits EApc66:Community contaminant prevention - airborne releases
posted by  Robert Millspaugh  on 

I referenced this credit in an e-mail to a boiler manufacturer and he said that the SCAQMD standards in the description were not current.

0

Open bottom planters

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Michael E. Edmonds-Bauer  on 

Reading the missing manuals I saw that planters can contribute to credit compliance as long as they are open bottom. By language barriers we do not fully understand the difference betweet an open

1
Wed Jul 10, 2013, 3:13 pm

Material Reuse on Other Buildings within Site Boundary

NC-2009 MRc3:Materials Reuse
posted by  Josh Sawyer  on 

We are working on project that has four buildings connected together on the site.

1
Mon Apr 15, 2013, 1:53 pm