FSC Mix

Schools-2009 MRc7:Certified Wood
posted by  Ema S  on 

Our cabinets are 70% FSC Mix...our understanding is that FSC mix wood is "mixed source products that are a blend of FSC100%, recycled and or controlled fiber". The LEED credit form states that only

1
Tue Nov 5, 2013, 1:53 am

enlosed smoking room outside the building

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Erin Holdenried  on 

Hello, I have a project that does not allow smoking within the building. However, there are small one room kiosks outside the building that allow smoking.

1
Mon Nov 4, 2013, 12:43 am

Automatic Shades in the Option 2: Prescriptive Method

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Nelina Loiselle  on 

The credit language for c8.1 is states: "However, designs that incorporate view-preserving automated shades for glare control may demonstrate compliance for only the minimum 0.150 value" I'm I c

1
Wed Apr 17, 2013, 12:24 pm

Option1 or Option 2

ND-v2009 NPDp3:Connected and open community
posted by  Noriko Nagazumi  on 

Hi, Our project is located on a 83 acre site with internal streets.

1
Wed Apr 17, 2013, 2:48 pm

Skateboard Wall Panels

CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Holly Nichols  on 

I am hoping to use a product that uses bamboo end cuts from the waste stream of another manufacturing process as wood wall panels.

1
Wed Apr 17, 2013, 1:43 pm

Campus setting uploading refrigerant data LEED letter template

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  John Covello  on 

Hello, This is a sort of how to LEED Online question. We have a resort campus setting. There will be several different sizes of guest villas as well as public spaces and staff facilities.

1
Mon Nov 4, 2013, 5:27 pm

SS Cr1: Path 9-Innovative WasteWater Technologies

CI-2009 SSc1:Site Selection
posted by  Sourabh Gupta  on 

In one of my project, they are attempting this point. While we have the water fixtures details & occupancy of the project space(tenant) only.

1
Mon May 13, 2013, 6:26 pm

Refrigerant Management Plan

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Robert Calloway  on 

I have completed a Refrigerant Management Plan for a building and when I go to upload it to the EAp3 credit there is nowhere to place it.

1
Tue Oct 15, 2013, 11:36 am

Community Center on Park Land

NC-2009 SSc1:Site Selection
posted by  Paula Jarrett Nasta  on 

If you are putting a Community Center and Fire Station Building on a site that is currently a portion of a park is that project exempt from the 'do not build on previous park land" criteria and th

1
Sun Nov 3, 2013, 3:37 am

LEED Boundary

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Antwon Williams  on 

I would like to know what determines the site boundary for capturing the 90% anual rainfall total. Does the treatment area have to be the entire site boundary?

1
Thu Apr 18, 2013, 9:12 pm