Forum quick links
Interior vegetation
NC-2009 WEc1:Water Efficient Landscapingposted by Albert Sagrera on
Hi!! Should we include interior vegetation on the calculations of this credit? This a building with several interior plants, including trees that need irrigation.
TSS efficiency values
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Albert Sagrera on
Hi! Where can we find accepted values for tss removal efficiency of a meadow or other tipes of vegetation?
Smoking Prohibition in a Border Crossing Building
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by María Fernanda Aguirre on
We are assessing the possibility of pursuing LEED Certification for a Complex of four buildings at the Border Crossing between Chile and Argentina.
(Jacob) Interior Courtyard Glazing + Energy Model
NC-2009 EAc1:Optimize Energy Performanceposted by Brett Beckemeyer on
I have a design using a full building energy model in order to achieve as many credits as possible under EAc1.
EUI for LEED projects
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Please, I would like to know where I can find the Energy Use Intensity (EUI) factors for LEED projects, according to their climate zone (per ASHRAE) and their activity.
EAp2/EAc1 - Case 2 Option 2b
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Peter Locke on
We are submitting a museum bldg and have had confirmation from GBCI that we can use Case 2 - historical data to compare against.
existing parking garage in the LEED project boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by yanghee pierce on
I am working on a project that is a part of campus. This project will be located next to a 4-story existing parking garage shared by other adjacent non-LEED certified buildings.
Clarifications
Healthcare-v2009 SSp1:Construction activity pollution preventionposted by BABAR MEHMOOD on
Since the prerequisite is related to the construction and involves mainly the main contractor on this. As a consultant we will include the requirements of this prerequisite.
Buried Tiles
NC-2009 WEc1:Water Efficient Landscapingposted by Amy Hood on
How feasible is it to provide a way to use storm water from the buried tiles (or ahead of them) for grass and garden watering.
ITE Parking Generation - Which data should be considered?
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Daniel Brum on
Our project is a mall, situated in a place with no local zoning requirements for parking.