Forum quick links
Clarifications
Healthcare-v2009 SSp1:Construction activity pollution preventionposted by BABAR MEHMOOD on
Since the prerequisite is related to the construction and involves mainly the main contractor on this. As a consultant we will include the requirements of this prerequisite.
Buried Tiles
NC-2009 WEc1:Water Efficient Landscapingposted by Amy Hood on
How feasible is it to provide a way to use storm water from the buried tiles (or ahead of them) for grass and garden watering.
ITE Parking Generation - Which data should be considered?
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Daniel Brum on
Our project is a mall, situated in a place with no local zoning requirements for parking.
LEED CI certificate belongs to Bld Owner or Tenant?
NC-2009 PIf1:Minimum Program Requirementsposted by Regina Gul on
Who owns the LEED Commercial Interiors certificate - the Tenat who hires the LEED AP and pays for the whole certification process, or the Owner of a Building where the Tenat's certified space is l
WEc2 vs. Pilot Credit 10
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Anna Korinkova on
Hi all, do I understand correctly that the pilot credit allocates WEc2 requirements to Option 1 and Option 2 and adds Option 3? My project reduces use of potable water of 47 % just by installing ef
Can Low missission gas generator qualify for EAc2?
NC-2009 EAc2:On-Site Renewable Energyposted by Mahbuba Khan AIA, LEED AP BD+C on
I am doing a factory building in Dhaka Bangladesh. To offset the power outage, they are going to use gas generator.
SOP's
EBOM-2009 IEQp3:Green Cleaning Policyposted by David Wood on
For this prerequisite, do you need to put the specific SOP's for the building? Example Floor-care maintenance shall consistently be performed according to written protocols, without exception.
Plastic Laminates
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Lance Barron on
The inclusion of plastic laminates (for countertops, etc.) are included in IEQc4.4 is not clear.
Interior structural walls
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Michael Beattie on
Hi- In filling out the LEED Online form for MRc1.1, I'm puzzled by the check box confirming that only one side of the interior structural walls has been counted.
European wood certificates
CS-2009 MRc6:Certified Woodposted by Antonio Rodriguez on
Hello everyone, Our project has some wood used in interiors, but most of it would be bought in Spain. Should we expect that our supplier has an FSC certificate?