Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

CxA Experience

NC-2009 EAc3:Enhanced Commissioning
posted by  Ameet AA  on 

LEED online template/ form require the following: "Enter information for two projects commissioned by the CxA which are similar in scope and type to this LEED project building" I am working on

1
Fri Jun 7, 2013, 2:29 pm

Epoxy Finishes

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  shaun Andriano  on 

I've read through the list of previous comments, but am still a little confused based on the latest template updates.

1
Tue Jul 9, 2013, 2:28 pm

Sharing the system with toilets

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Mike D  on 

Can this be achieved if the cleaner's cupboard and the toilets share the same extract system?

1
Mon Apr 29, 2013, 6:43 pm

Supplementary ventilation for after-hours

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Diana Nezamutinova  on 

Our project has one primary ventilation system for the entire project space served by the base building AHUs.

1
Mon Nov 4, 2013, 3:36 pm

Campus/District Geothermal Loop

NC-2009 EAc1:Optimize Energy Performance
posted by  Aaron Cook  on 

Is there a guidance document/discussion available on how to treat a campus geothermal loop (servicing several buildings) that provides the working fluid to the LEED project building conditioned wit

1
Tue Apr 30, 2013, 2:08 pm

EAc1.3 Simulation for LEED CI

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Jimena Etchegaray  on 

HELLO. We have a project that will be applying for LEED certification under CI for Retail. This project is supermarket within a mall, the retail space is rented.

1
Tue Apr 30, 2013, 2:00 pm

Cistern doesn't fulfull need, but there is no-potable backup

NC-2009 WEc1:Water Efficient Landscaping
posted by  Sarah Picking  on 

If you can't prove that your cistern will satisfy the irrigation need every month, but the client has agreed to not have a potable backup (ie the cistern gets drained, and then the plants just live

0

Can Exterior Plantings count in MRc6?

Schools-2009 MRc6:Rapidly Renewable Materials
posted by  Cheryl Dieso  on 

We have a Science & Math HS Building under construction and have come up short with our rapidly renewable products. We are investigating various approaches in order to meet this credit.

1
Tue Apr 30, 2013, 6:04 pm

Pilot Credit 10

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Alicia Villanueva  on 

Hallo, My team and I have reduced water use in a project through high-efficient flush fixtures by 39%. In addition, 100% of the water used for sewage conveyance is treated on-site to tertiary stand

0

ID Credit for using building envelope material

NC-2009 IDc1:Innovation in Design
posted by  JOSE R. TAGLE  on 

Could I apply for an ID credit for using a totally inorganic, crushed glass and absolute closed celled material from building envelope.

1
Tue Apr 30, 2013, 6:02 pm