CS-2009 IDc1:Innovation in Designposted by Morteza Kasmaei on
We are working on a LEED-CS project. Our client asked the architects to add a touch-screen kiosk in the building lobby to inform occupants and visitors about the project's green features.
Who develops the plan for corrective action?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Nicole Kimoto on
For a government project if more than 20% of respondants are dissatisfied who would be responsible for developing the plan for corrective action?
Ventilated attic roofs - Baseline Vs Proposed
CS-2009 EAc1:Optimize Energy Performanceposted by Ioannis Rizos on
Dear Community, we have a situation where our proposed design utilizes a double roof (i.e. naturally ventilated attic) as part of the building's passive environmental design.
green roof cover - ivy
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Mario Pinoli on
Hello, I'm working on a project which is considering to use the ivy as green cover.
Vertical addition to a hotel project
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Adam Targowski on
My client is designing a hotel project which will be built in two phases.
CS - Residential Building
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by CRolim Engenharia on
Hi, I work in a project of a multi-family residential building. I have a doubt to fill item 6.
Entry mat in vestibule w/ tile surround
Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Rebecca Molldrem on
We have a client who will do the entry mat in the main vestibule, but want a band of ceramic tile all the way around it.
School addition - LEED Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by padraic o connell on
Hi all, Our project is an addition to a school - LEED NC.
changing prerequisite completed forms
Pilot-Credits EApc67:Energy Jumpstartposted by Linda Francis on
Once you've submitted your project for review, how do you change prerequisite forms?
Rainwater collection
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Heather Holdridge on
I'm assuming the area used for a rainwater cistern within a LEED project boundary is not factored anywhere in the template for this credit -- Is this correct?