Forum quick links
List of approved LEED modeling Software
NC-2009 EAc1:Optimize Energy Performanceposted by Lawrence Lile on
I find a listing of approved software for LEED energy modeling here http://energy-models.com/blog/list-approved-leed-simulation-software-packages and in the EAp1 leedonline form.
Park & Community Centers = Services?
Schools-2009 SSc2:Development Density and Community Connectivityposted by Jennifer Berthelot-Jelovic on
Can the playground of the School we are working on count as a park if it includes a living stream, trees, benches, trellis, places for the students to lounge around as if they were in a park?
VOCs emissions after given number of days
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Jean-Baptiste Noel on
Hi, I have an adhesive technical data sheet stating the VOCs emissions 3 days and 28 days after laying of the adhesive. I do not think this is enough to document the requirement, but do you think
Exterior Lighting for Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
We refer to ASHRAE 90.1 Supplementary Addendum i which discuss the LPD of tradable surface on table 9.4.5.
Does casework count for MR4, MR5 and MR7?
Schools-2009 MRc7:Certified Woodposted by Caroline Kilbane on
Casework is specified under division 12 of the CSI spec format, similar to loose furnishings. Does that mean we can and should exclude it from the calculations for the MR credits?
JT Eatons Bait Blocks Peanut Butter or Apple (Tier ll)
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Michelle Bracewell-Musson on
Hello, Due to where the building is located (between fields), it seems we need to have these bait blocks (placed outside the buildings) used continuously or there is a problem.
HCFC123 or HFC410A
NC-2009 EAp3:Fundamental Refrigerant Managementposted by edward deschapell on
On a new construction project which is the better way to go when installing a new chiller? A chiller with HCFC or HFC? Thanks
Parking space separate problem
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Nan ZHANG on
Dear all, Our project is a synthesized building with office, shopping mall and residence. Only the part of the office will apply for the LEED certification.
Within Boundary-Consider only 1 service&shud be open to public?
NC-2009 SSc2:Development Density and Community Connectivityposted by Muna Akheel on
“For mixed-use projects, no more than 1 service within the project boundary may be counted as 1 of the 10 basic services, provided it is open to the public.” 1. Does this mean that only 1 service
infill site
ND-v2009 SLLc8:Restoration of habitat or wetlands and water bodiesposted by Cardy V on
Hi Eliot, Is this credit achievable if the site is located in a previously developed site? what if the developer introduce native plants, which will enhance wildlife habitat?