ND-v2009 SLLc8:Restoration of habitat or wetlands and water bodiesposted by Cardy V on
Hi Eliot, Is this credit achievable if the site is located in a previously developed site? what if the developer introduce native plants, which will enhance wildlife habitat?
LEED Project Boundary for a Train Station
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michael G on
Hi all, I have an issue properly defining the project boundary for a Train Station on a large overall site which includes the station, outdoor plaza, train platforms, large parking lots, a substati
Airflow Monitoring Devices Specifications
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Ahmed Younis on
Does the (airflow sensor) need to have any specifications other than the required accuracy (which is 15%) which was mentioned in the study guide?
water use reduction calculation
NC-2009 WEc1:Water Efficient Landscapingposted by Jamal Uddin on
How to calculate the baseline building performance with compare to my building performance in water use reduction?
LEED Project Boundary of vertical attached building
NC-2009 PIf2:Project Summary Detailsposted by Nan ZHANG on
Dear all, I'm working on a vertical attached building project.
Tenant Submetering
CI-2009 EAc3:Measurement and Verificationposted by sompoche sirichote on
I have read the previous threads but still not sure about the tenant submetering. The Table 2 in LEED CI guideline indicates that no submeter is required for the cooling if it is included in prora
Cooling EIR as the only evidence of PFan modeled separately?
NC-2009 EAp2:Minimum Energy Performanceposted by Ting Wang on
We received an comment review about a system 6 (PVAV w/ PFP boxes) baseline model in eQuest: The SV-A reports indicates that the cooling efficiencies for the HVAC systems were not correctly reflect
Direct grid feed in - eligible?
NC-2009 EAc2:On-Site Renewable Energyposted by Jens Apel on
After reading all threads and LI I am still unsure if PV production directly fed into the grid is eligible for EAc2. Consider a PV array owned and operated by the building / LEED project owner whic
Credit language
Pilot-Credits PC14:Walkable Streetsposted by Michael Beattie on
HI all, The language of this pilot credit and this discussion raises questions that I'd love to get clarification on: Is the required distance between street trees 45 feet (15 meters) or 450 feet
Pilot credit
ND-v2009 IDc1:Innovation and exemplary performanceposted by Noriko Nagazumi on
Hi, We are seeking oppotunity to achieve a point via pilot credit. We can find only one pilot credit applicable to ND in the pilot credit library in USGBC web site.