Other routes for airflow measurment devices

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Mike D  on 

Are there any other ways of achieving the credit for non-densely occupied spaces using another route than airflow measurement devices ?

1
Mon Jul 1, 2013, 5:48 pm

Frankenstein Building Reuse

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Brett Beckemeyer  on 

I am currently working on a project that has had 7 different additions dating back to 1956.

1
Mon Nov 4, 2013, 3:36 am

Rodent bait traps

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Sheryl Swartzle  on 

Our project does not have a problem with rodents but should one occur the contracted pest management company would use Havaheart traps, then remove rodents and release in appropriate areas instead

1
Wed Jun 12, 2013, 9:03 pm

Is it possible to modify a LEED boundary already registered?

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Mauricio J Perez R  on 

Dear all, We are developing the design phase of a LEED Project which is already registered in the LEED online.

1
Tue Nov 5, 2013, 4:34 pm

Moveable Walls for Views Calculations?

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Joanne Sawatzky  on 

Are moveable walls considered open or closed for Views calculations? I read furniture and partitions are not included: Does furniture need to be included in floor plan when completing views calcul

0

Baseline system types and building area

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

We have the project of to 250,000 sq ft. The Air conditioned area is only 50,000 sq.ft. The rest is enclosed unconditioned area (No HVAC) of 200,000 sq.ft.

1
Fri Jun 14, 2013, 2:23 pm

LEED EBOM on Industrial Buildings

NC-2009 PIf1:Minimum Program Requirements
posted by  Ricardo Sá  on 

I am aware that LEED for Existing Buildings: Operations & Maintenance is applicable to any commercial and institutional buildings, however, I would like to hear your opinion whether it is suita

1
Thu Jun 20, 2013, 3:23 pm

Shuttle takes 10min or less to get to the first bus stop

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Marcio Alberto Casado Pereira  on 

Hi, I was wondering if I can get this credit if my shuttle stops at a bus stop 10min or less after it departs from the project.

0

Durable Goods - Furniture

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Sabrina Cescolini  on 

We are working with a project building that is a large convention center and event hall, with some permanent offices. For MRc2.2.

1
Mon Jun 17, 2013, 2:59 am

Sealant VOCs

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Erin Holdenried  on 

For a product that "does not contain isocyanates, silicone, solvent or acids" does this mean there are 0 VOCs? Or are there other compounds that could be present that contain VOCs?

1
Mon Jul 8, 2013, 1:07 pm