Plan Template?

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Melissa Wrolstad  on 

Is there an M+V plan template for this credit? There is a template for the M+V 5.1 credit. Thanks, Melissa

1
Fri Jul 12, 2013, 7:37 pm

WE Fixture Group simple question

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Rick Alfandre  on 

I apologize for the simplicity of my question, but I want to make sure I am providing accurate information. If I have a commercial office building with 2 identical unisex bathrooms with no urinals

1
Fri Jun 21, 2013, 3:18 pm

Exclude retail?

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Mike D  on 

Our project has got some retail on the ground floor of an office building that the design team does not want to include in the LEED assessment.

1
Fri Jul 12, 2013, 6:10 pm

Renewable Energy Cost - Escalating Rate

NC-2009 EAc2:On-Site Renewable Energy
posted by  Timothy Casper  on 

Our project has a PV array which is leased by the building owner under a 20-year power purchase agreement. However, the agreed upon rate increases 2% each year during these 20 years.

1
Fri Jun 21, 2013, 5:39 pm

Parking spaces under a bridge

EBOM-2009 SSc7.1:Heat Island Reduction—Nonroof
posted by  Martin Vaclavik  on 

The parking area of our project is mostly located underground but there are some parking spaces on the ground level. Based on our calculation we can meet credit Option 2 requirements.

1
Wed Jul 31, 2013, 8:04 pm

ASHRAE Advanced Energy Design Guide - Mixed office/warehouse bld

NC-2009 EAp2:Minimum Energy Performance
posted by  Michael Smithing  on 

We're looking at a building that will have approximately 10,000 sqft. of office space and 10,000 sqft. of warehouse space.

1
Mon Jun 24, 2013, 2:22 pm

LEED project Boundary different from Construction Documents?

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Gary Caraway  on 

Is it possible to have a LEED boundary that differs from the actual limit of disturbance shown in the construction documents?

1
Tue Jul 23, 2013, 8:32 pm

Biodiesel Lawn Maintenance Equipment

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Sara Zoumbaris  on 

Hi All, Has anyone had a project where the owner had lawn maintenance equipment that ran on biodiesel?

1
Wed Jul 31, 2013, 4:11 pm

Pedestrian Walkway

NC-2009 PIf2:Project Summary Details
posted by  Ashley Sadowski  on 

Hello, We are adding a pedestrian crosswalk to connect the building to the opposite side of the street. This was not required and are hoping to achieve an ID point for including it.

1
Tue Jul 2, 2013, 8:25 pm

Average rainfall is sufficient for irrigation

CS-2009 WEc1:Water Efficient Landscaping
posted by  Ron Dean  on 

We have a project in Medellin, Colombia. The project has large areas of vegetation. In the driest month (January), it rains in average 12 of the 31 days.

1
Mon Nov 4, 2013, 6:54 pm