Forum quick links
Document ALL items?
NC-2009 MRc7:Certified Woodposted by Jamie Abernethy on
If I take the default 45% of contract price for divisions 3-10 just in the concrete and steel my totals are 80% plus for recycled content and regional materials.
Recertification
CI-2009 PIf5:Previously LEED Certified Detailsposted by David Wood on
I had one more question about recertification.
WEpc10 through use of cistern
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Joanna Switzer on
Hello, Latest one of my projects pursuing this pilot credit is a daycare facility. Adult toilets are low flow, but child sized toilets are standard 1.6gpf.
Allocated Parking Space but Need to Pay
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by SW LEE on
Hi , We wish to attempt case 1, option 2, no subsidy. In the tenant contract, it mention, the building owner will allocate 17nos of parking space which each parking space will cost the tenant USD
Street trees
Pilot-Credits PC14:Walkable Streetsposted by Florian Schmidtchen on
How is distance between street trees measured? From center to center or from the border of the crown to the next crown border?
Operable Windows Complaint Area
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Gurneet Singh on
As per the requirement operable window can be counted as control for all the occupants occupants located within 20 feet of the exterior wall and within 10 feet of either side of the operable part o
Retrofit
Healthcare-v2009 IEQp3:Hazardous material removal or encapsulation (renovations only)posted by Marina Andrade on
Our Project is suffering a retrofit in a abandoned building, and doesn't have any occupant since the 70's.
Accounting for common/shared areas
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Robert Calloway on
This question is in regards in to LEED CI 2009 - Credits EAc1.1 & EAc1.2 for lighting power density and light controls. Do tenants have to account for common areas and spaces for lighting powe
Accounting for common/shared areas
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Robert Calloway on
This question is in regards in to LEED CI 2009 - Credits EAc1.1 & EAc1.2 for lighting power density and light controls. Do tenants have to account for common areas and spaces for lighting powe
Buildings Attached to non LEED-certified buildings
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Zachary Mathern on
I am referring to the Supplemental Guidance to the MPR's; All Attached Buildings, 2) Treating Energy Systems.