NC-2009 PIf4:Schedule and Overview Documentsposted by Michael Beattie on
I've been waiting to upload the drawings for our project until the revisions generated by Owner and Contractor have been complete, and the drawings reflect what's actually being constructed.
School as a Teaching Tool vs ID Green Building Education Program
Schools-2009 IDc3:The School as a Teaching Toolposted by Rebecca Molldrem on
Since ID Credit 3 is an option under LEED for Schools, does this mean that if a project is not pursuing this, they also wouldn't be able to pursue an Innovation in Design credit for a Green Buildin
Calculating parking area
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Sean Hogan on
I have a project seeking certification which has approximately 750 surface car parking spaces.
Complete information on Variable Speed Control
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Mike D on
There are no pumps or VAV fans on this project which are 5hp or greater.
Energy modeling review question
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
For a LEED project that recently received the preliminary design review comments, we were asked to analyze and correct the documentation to comply with pre-requisite EAp2.
Process Equipment Refrigerant
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Jalal Avades on
I have a school building with an old walk-in coolers/freezers used in the Kitchen. Those do have CFC refrigerant.
Plant space in Default occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Mike D on
We have included all areas of the building within the Default Occupancy Table. However, there is still the Plant Space we have not included. Can this be omitted?
PVC for disabled access
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Esther Izquierdo on
In our CI project the architect will specify carpet as a finish to the existing raised floor.
Storage Equipment
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Jeremy Kuhre on
We are currently pursuing this credit for a GSA project. All systems furniture is GreenGuard certified. There is some miscellaneous metal shelving and bulk storage however that is not certified.
US american REC´s for european projects
NC-2009 EAc6:Green powerposted by Doreen Kruschina on
Hi, we recently received an ad promoting the sales of US-american REC´s that would count towards the green power credit. Anyone familiar with www.renewablechoice.com? Thanks