Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Reference Building

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Mark Webster  on 

How have project teams been defining the reference building for this credit?

0

Vehicle maintenance and storage

NC-2009 PIf1:Minimum Program Requirements
posted by  Lawrence Lile  on 

I would like to determine if a project could be certified.

1
Tue Jul 2, 2013, 8:27 pm

Tenant performance of base building improvements

CI-2009 SSc1:Site Selection
posted by  Susan Di Giulio  on 

We have a client who is leasing two entire, adjacent buildings for 12 years. They are taking on installing high SRI roof membranes and a photovoltaic canopy system in the parking lot.

1
Mon Nov 4, 2013, 4:14 pm

WEp1 for Multiple Building

CS-2009 WEp1:Water Use Reduction
posted by  Marina Andrade  on 

I´m working on a project that is a campus with 2 warehouses, an administrative building, a large dining room, a little auditorium and a changing room.

1
Mon Nov 4, 2013, 7:19 pm

Bus "route" versus bus "line"

CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Access
posted by  STEPHEN F OURS  on 

My project is served by three different bus "routes" (AT2, AT4 and AT5) that make stops that are located well within the 1/4 mile walking distance.

1
Thu Jun 27, 2013, 8:16 pm

ASHRAE Mandatory Requirement 6.4.3.4.3

CS-2009 EAp2:Minimum Energy Performance
posted by  Jorge Torres-Coto  on 

I have a multi-story building that has one AHU per floor taking OSA from a common vertical shaft.

1
Fri Jun 28, 2013, 2:12 pm

Coating - SRI

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  SW LEE  on 

Is paint or coating with proper tested SRI standard can earn this credit?

1
Mon Nov 4, 2013, 6:46 pm

Alternative Daily Cover

CI-2009 MRc2:Construction Waste Management
posted by  Lawrence Lile  on 

We are building a maintenance facility at a landfill. It would be very easy to use excavation material as Alternative Daily Cover, as the area that uses this is very close.

1
Fri Jun 28, 2013, 1:15 pm

Moving Compost

CI-2009 MRc2:Construction Waste Management
posted by  Lawrence Lile  on 

Soil is generally not allowed to be included in waste diversion calculations. But what if we are moving compost?

1
Fri Jun 28, 2013, 1:34 pm

Instantenous electric water heaters

NC-2009 EAp2:Minimum Energy Performance
posted by  Adam Rustige  on 

Hello, The model I'm working on has instant electric water heaters, per 90.1 7.4.2 Equipment Efficiency, "Equipment not listed in Table 7.8 has no minimum performance requirements." Electr

1
Fri Jun 28, 2013, 2:17 pm