Pilot-Credits PC14:Walkable Streetsposted by Jennifer Preston on
Does the "feedback survey" refer to the "Additional Questions" listed on the Bird's Eye View tab? Or is there another survey that this is supposed to be linked to?
Exclude retail?
NC-2009 PIf1:Minimum Program Requirementsposted by Mike D on
Our project has got some retail on the ground floor of an office building that the design team does not want to include in the LEED assessment.
Modify Established Project Boundary?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Ali Kopyt on
The client for our CI-2009 project has decided to expand their footprint within the existing building to include more office spaces.
SS 4.3
Healthcare-v2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Marina Andrade on
Our project is an hospital and the municipal code requires that places that generate traffic, like hospitals, they must have motorcycle parkings too, not only parking capacity for cars, we have to
Gross Floor Area, Mechanical Space
NC-2009 PIf2:Project Summary Detailsposted by Gary Ashford on
ASHRAE is not specific about deducting for floor openings. For cost estimating and code review, we normally deduct elevator shafts and stairwells.
Non-potable water sources
NC-2009 WEc1:Water Efficient Landscapingposted by Inés Alomar on
We are participating in the certification of a building in the Europe Square in L’Hospitalet, Barcelona. The Europe Square area was previously and industrial area.
ID for Green Walls
NC-2009 IDc1:Innovation in Designposted by Maya Karkour on
Hello, We are consulting on a large shopping mall and the Client will be covering one of the building facades with vegetation (roughly 25% of the vertical walls area will be covered). Do you thin
Peak Demand...hourly, daily, weekly, monthly
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Common sense tells me they are not interested in by the second peak energy demands for each end user...so to ask the stupid question: Which average value should I output here...hourly average annua
Update of the energy modelling for the construction review
CS-2009 EAc1:Optimize Energy Performanceposted by Juliette Barach on
Hi, I'm currently working on a LEED CS office building, and can't find a clear answer to my question in the LEED referential, user's guidance or standard: Do I need to update the energy modellin
Lines of sight depth cutoff
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Matthew Macko on
Is there a requirement for the depth of lines of sight to exterior glazing to be compliant with this credit?