Forum quick links
Design a pump for 20 story building
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
Apart from LEED/USGBC, I want to design a pump which can supply hot water at each floor's apartment for space heating (of total 20 floor). what will be the head?
Floor Coating
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by L W on
Has anyone successfully submitted an opaque traffic coating with VOC over 100 g/L for use in a mechanical room or space other than a parkade (i.e. pedestrian traffic) under any version of LEED?
Plant Based Binder
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Omar Elrawy on
Dear all, I'am using acoustic tiles for the ceiling, which is a "Fibrous glass wool" material with a certain formaldehyde content, and a supplier's datasheet states that "the baseboard
Transfer air into residential units
NC-2009 IEQp1:Minimum IAQ Performanceposted by AshLee Eustace on
I'm trying to show compliance with IEQp1 using indirect mechanical ventilation in residential units. Makeup air units supply the corridors which indirectly ventilate the residential units.
Zero Lot Line Buildings
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Andy Rhoades on
For those of you working with zero lot line buildings: we have seen the reviews vary in the past pertaining to documentation submittals.
Energy Model Calibration by Post Construction data
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Gabriela Hernández Castillo on
Our Project is applying for M&V plan option D method 2, which let us calibrate the energy model with post construction measures.
Can a project achieve points if no process water in scope?
Retail-CI-v2009 WEc1:Water use reductionposted by Agnes Vorbrodt on
Can a project achieve the 6-11 points available for only building water use within the tenant space, if no process water is in the project scope? Thank you.
WEc1
NC-2009 WEc1:Water Efficient Landscapingposted by Drew Cheatham on
Can someone direct me to where in the Reference manual it states that the ratio of landscaped area to site area has to be greater than 5%?
Testing Adjusting & Balancing (TAB)
NC-2009 EAc3:Enhanced Commissioningposted by Michael Murphy on
Are there any LEED specific requirements for TAB work?
WEp1 credit for student apartments
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Joyce Ganthavorn on
Hello! I am currently working on the WEp1 credit for a student apartment. I am pretty new to the project and I was hoping someone could help me out by answering a few questions. 1.