Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Prop 65 and CDPH/EHLB Questions

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Catherine Blakemore  on 

If adhesives, sealants and primers are listed on Tables listed under Groups 2, 3 or 4 and they meet the California Department of Heath Services Standard, does this constitute compliance with Prop 6

0

Reflectance values

Pilot-Credits EQpc22:Interior lighting - quality
posted by  Jennifer Preston  on 

If all of our surfaces meet the minimum thresholds for reflectance - as documented by manufacturer-provided cut sheets - do we need to include calculations for a weighted average of surface reflect

1
Wed Jul 10, 2013, 8:19 pm

Durable Goods Lease Contracts

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Taygun Yüksel  on 

In one of the chain company, it only exits leasing contract both with computers and printers/ scanner equipment. Contracts cover fixing and change by their services.

1
Mon Jul 15, 2013, 3:05 am

IEQc4.1 and IEQc4.3 and silica sand in sanded grout

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Jill DeMarotta  on 

Has anyone found a sanded grout that doen't have silica sand in it? It seems like our only option is to go with an unsanded grout or something more expensive....

0

Tenant Area HVAC System

CS-2009 EAc1:Optimize Energy Performance
posted by  Nidhi Khanna  on 

Hi, I am working on a mixed use project with retail on 1st floor and office on 2nd and 3rd floor with a total project area of 115,000 sf.

1
Thu Jul 11, 2013, 2:54 pm

Everything is an assembly.

CI-2009 MRc5:Regional Materials
posted by  Valerie Molinski  on 

I recently got a review back that said that every material I am using to demonstrate compliance for Mrc5 is an assembly and "therefore, the individual components must be separated by weight." Sinc

1
Thu Jul 11, 2013, 8:18 pm

Forklifts as Individual Workstations

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  Craig Wilson  on 

I am working on certifying a warehouse, and would like to consider the forklifts as individual workstations, as the warehouse employees are each assigned one (in lieu of a desk) and allowed to pers

1
Wed Jul 31, 2013, 3:44 pm

Vehicle tracking control dirt road

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Juan Robles  on 

We are working on a project in Costa Rica where the access road is a dirt road.

1
Fri Jul 12, 2013, 3:04 pm

Full Height Glazing

Healthcare-v2009 IEQc8.2:Daylight and views - views
posted by  Lauren Bellamy  on 

Per step 2 for noninpatient buildings and areas "for portions of the perimeter wall with full-height glazing, the qualifying area may be extended beyond the 15-foot limit to twice the head height o

0

raised floor

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Florinda Garcia   on 

does the raised floor has to meet the floorscore requirements?

1
Tue Jul 16, 2013, 4:56 am