Forum quick links
Propane
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by American University on
Does propane count as an alternative fuel? Seems to be one of the most commonly available alternative fuels for landscaping equipment.
Asbestos abatement for existing building renovation
CS-2009 SSc3:Brownfield Redevelopmentposted by Nereyda Rodriguez on
The Phase I Environmental Site Assessment indicated the property as having "no Recognized Environmental Conditions in connection with the property", BUT the building has asbestos containing materia
LEED CI inside a LEED C&S certified building
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Cinthia Kawano on
We are dealing with a Commercial Interior Project, which is located inside a LEED C&S certified building. Regarding the credit SSc3.2, the attendance of the LEED C&S building (SSc4.2) does
LEED CI inside a LEED C&S certified building
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Cinthia Kawano on
We are dealing with a Commercial Interior Project, which is located inside a LEED C&S certified building. Regarding Car/Van Pool credit (SSc3.3 for LEED CI), the page 93 under 4.Implementatio
Percent Annual HVAC Energy Cost Reduction
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Saju Varghese on
Which Cost reduction equation should be used on template when cooling plant has been updated with a high efficiency chiller and therefore proposed has been modeled including all the areas that th
Multiple small split systems - Can they ever work?
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Robert Wichert on
I have about sixty-five split systems in two apartment buildings using R-410a. The factor that is keeping me from meeting this credit's requirements seems to be Rc (lb/ton).
simulation program for natural ventilation
NC-2009 IEQc2:Increased Ventilationposted by Adam Targowski on
Is there any list of programs which can be used to demonstrate compliance with IEQ Cre 2 Option 2. Do you know if DesignBuilder can be used to show appropriate airflow rates?
Open office - do I count the inner offices & meeting rooms?
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Stantec BG+LU FW on
I am doing the calculations for the "daylight factor method" for Daylight and Views credit. It is an office floorplate that is roughly 150'x150' with an inner core.
Native and Adapted Plants
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Charlotte Page on
Hello everyone, New to LEED, and I have been trying to figure out who determines what is native and what is adaptive? Need to put a list together for the project that I am working on.
Lighting load synergy in EAp2 and EAc1.2
CI-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Total lighting load for project space under EAc1.2 would be the same as connected lighting load under EAp2?