Contractual Relationship
CI-2009 EAc2:Enhanced Commissioningposted by Brian Smith on
The owner is looking for CI-2009 Enhanced Cx on a project. The CxA was originally contracted through the GC as they were not a prequalified vendor of the Owner.
Documentation for upload
NC-2009 SSc1:Site Selectionposted by Olga Kozub on
I have a project in Russia. In Russia we use the local equivalent of the United States Code of Federal Regulations named State Immovable Property Cadastre.
Materials to be included
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Michael Haugeneder on
We are working on a project in Berlin.
Accessible Bus Stop
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Brett Beckemeyer on
Our project has several bus stops within the 1/4 mile radius, and what I would consider to be the most direct route along the street to the stops is also within 1/4 mile walking distance.
Green roof deck
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by mariela garate on
Hi, We are willing to use an innovative type of green roof that's based on compacted plastic waste board and textile (1,3cms thickness + textile). This substrate replaces the need of soil.
Vacancy sensors in place of occupancy sensors
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Heather Dorer on
Can vacancy sensors be used in place of occupancy sensors in appropriate spaces? Vacancy sensors, like occupancy sensors, will turn the lights off when the room is deemed vacant.
Is flush out possible in countries with high humidity?
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Katherine Ann Resurreccion on
Hi, we would like to know if flush out is practicable in areas where high humidity is experienced whole year, say 70-85%. Should we cancel out option 1 already and go for option 2 (IAQ testing)?
Blower Door Test for Non-Smoking Hotel: IEQP2: ETS Control
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sasha Peters on
Blower Door Test for Non-Smoking Hotel For a Hotel Project where the Owner has confirmed its policy to be entirely non-smoking, is the requirement to conduct blower door testing (IEQP2: ETS Contro
G3.1.3.13 of ASHRAE 90.1-2007
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I'm modeling a baseline model (System 5) and I have to apply G3.1.3.13 of ASHRAE 90.1-2007: "Minimum volume setpoints for VAV reheat boxes shall be 2.15 l/s*m^2 of floor area served or the minimum
Recertification under previous version
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by David Wood on
Has there been any clarification on recertification under previous version for this credit.