Pilot-Credits PC14:Walkable Streetsposted by Kath Williams on
If a pilot credit is repealed (under Resources, it says March 2013), does that mean a project can not submit this credit even if the project is registered for the credit?
Option 2-Air Testing - Building with Phased Completion
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lilian Seow on
We r building 424 residential units - 46 storeys high tower.
Core performance path
NC-2009 EAc1:Optimize Energy Performanceposted by Jatuwat Varodompun on
Core performance path We plan go for the option 3 the core performance 1 For Section 2.9 equipment efficiency, We have 500,000+ Btu/h VRF compressor which is specified in CEE Tier two as "NA".
Square feet calculation
NC-2009 EAp2:Minimum Energy Performanceposted by LORENZO ORSENIGO on
Hello, we are working on a project LEED C&S in 2009 of approximately 100,000 square feet. The property doesn't want to implement the energy modeling due to economic issues. Since the project is
Monthly energy use data
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Natascha Altensen on
Hello, does anyone know, whether energy data used for the Energy Star Portfolio Manager rating have to be based on monthly summaries or if they can also be submitted as quaterly or annual summaries
Multiple Mode
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Omar Elrawy on
I need to know what is meant by the "Multiple Mode" mentioned in the the scorecard form under the "Lighting Control Type"?
Individual thermal comfort controls
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Regina Gul on
We are working on a LEED 2009 C&S project.
Retention Tank
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Anna Korinkova on
Dear Leedusers, our project will install a retention tank which will collect storm water from the whole LEED area. The retention tank will provide water for flushing toilets and watering greenery.
Hotel lotions and shampoos EBOMv2009
EBOM-2009 IEQp3:Green Cleaning Policyposted by Tyra Sorensen on
A hotel project going after Green Cleaning as an ID credit. What all needs to be included in the policy? Do the lotions, shampoos, and conditioners need to be included? What about the paper on the
FSC Material Used, Mfg Not Chain of Custody
Schools-2009 MRc7:Certified Woodposted by Erin Storlie on
Our Millwork (Cabinet) Manufacturer purchased FSC material, but was not COC certified.