Water requirements much higher in LEED
NC-2009 WEc1:Water Efficient Landscapingposted by Mike D on
The LEED form gives a certain amount of water based on the calculations.
Daily or monthly?
NC-2009 WEc1:Water Efficient Landscapingposted by Mike D on
The table on the form calculates the irrigation in July (month with higest demand). Is this the irrigation requirement for the whole month or for one day during July only? Thanks!!
Number of simulation models
CS-2009 EAp2:Minimum Energy Performanceposted by Lucie Cervena on
We are working on an eQuest model of an extensive project that is goinig to be certified as „one building“ with the total gross square footage of 1,670,000 sf.
Emergency lights
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Saju Varghese on
Do emergency lights need to be included in this list?
Products with Recycled Content
CI-2009 MRc7:Certified Woodposted by Lara Schneider on
Ok, from what I am gathering, wood products with both recycled content and FSC mixed cannot count for both MR4 and MR7, correct?
Wood deck SRI
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Vanessa Bermudez on
I am working on a project registered under LEED NC 2.2. The roof includes a wood deck and I have not been able to find the SRI for wood. Any suggestions?
Server/ Computers in Data Centre
CI-2009 EAp2:Minimum Energy Performanceposted by Anthea Ng on
We have an interior renovation of works in a datacentre aiming for LEED-CI certification. The project area is managed and owned by the same client.
Kitchen Exhaust Make-Up Air
NC-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Gary on
Can the make-up air (CFM) provided for a kitchen hood exhaust system be considered as part of the total OSA CFM, in the VRP calculation?
Timing of blower door tests
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Ilana Judah on
When can the blower door test take place? Can it be done when the drywall has been completed or do the cabinetry and appliances need to be installed as well?
College campus LEED boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Jason Roberdeau on
We are working on a new residence hall which is located between two existing (non-certified) residence halls on a college campus.