Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Floor Area

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Simon Sue  on 

In pursuit of flush out for the project, should "gross floor area" be used or "net occupiable area" for the calculations? The "FAQs for IEQc3.2" section on this page states "all occupied gross floo

1
Mon Nov 4, 2013, 1:51 am

Universal Design

Pilot-Credits PC34:Design for Adaptability
posted by  USGBC National Office (in DC) BG+LU FW  on 

This particular single family home was designed for adaptability by request of the client.

0

New Addition

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Jeff Potter  on 

Hi, We are designing a 36,000sf addition to a 55,000sf school. This school addition will be an extension of the existing school buildings wing.

1
Mon Nov 4, 2013, 3:22 am

Daylight measurement requirements...

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Rick Alfandre  on 

I am not finding any parameters for the daylight measurement option as far as times of day or other issues.

1
Mon Oct 7, 2013, 12:24 pm

20% Documentation Requirement

EBOM-2009 MRc5:Sustainable Purchasing—Food
posted by  Elliot Powers, LEED AP BD+C  on 

I cannot seem to find any language, either in the RG, LEED Online credit form, or in any prior discussions here that specifies how this 20% requirement applies.

1
Mon Oct 7, 2013, 12:52 am

Stone counter adhesive/filler - problem with VOCs

Homes-v2008 MRc2:Environmentally preferable products
posted by  Melanie Loftus  on 

I'm running into a problem on more than one LEED-H project. There is a product, Superior Knife Grade, that is used as adhesive and filler in stone counters.

1
Mon Dec 23, 2013, 8:22 pm

Project boundary for addition and major renovation

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  kelly ryan  on 

I am Working on a project with a 2 story addition. A portion of the project includes a major renovation to the building entry. My question lies with where to define the project boundary.

1
Mon Oct 21, 2013, 11:27 pm

Form Release Spray VOC limit

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Crissy Tsai  on 

Under Rule 1113; June 3, 2011 Architectural Coatings: Form Release Compounds have a current limit of 250 g/L and then 1/1/14 it drops to 100 g/L.

1
Tue Oct 8, 2013, 11:23 am

SSc4.1 School Documentation Map

CS-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Armen Isagholi  on 

I submitted for this credit and received the comments back with a pending designation...I am complying with Option 1 - Bus Rapid Transit station but they want to see a revised site drawing showing

1
Mon Oct 21, 2013, 11:52 pm

Must the space for the Systems 9 and 10 be heated?

CS-2009 EAp2:Minimum Energy Performance
posted by  tiantian zhou  on 

Dear sir/madam, For the area of mechanical ventilation, the actual design has no heating but ventilation.

1
Wed Oct 9, 2013, 7:34 pm