Forum quick links
the fan power of Systems 9 and 10
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir/madam, Per the Revised Section 1 4 Tables (Dec 2012), for Systems 9 and 10,the fan power=0.3*supply air flow rate(cfm).
SSc4.3 SSc4.4.
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Marco Antonio on
Hello friends! I am following the certification of an institutional building where we were given the credits and SSc4.3 SSc4.4. Occurred to acquire more land for parking garage where we use and we
SS9.1 area seating requirements
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Perkins and Will on
In our healtchare project, we have many areas that are designated as places of respite for visitors and staff that vary in size based on square footage.
Total Peak occupancy filled in Plf 3 AND the one used in IEQ P1
NC-2009 PIf3:Occupant and Usage Dataposted by Tam Kin Hung on
I am working on a LEED EB project, the Total Peak occupancy filled in Plf 3 is clear, however, but just wonder how this number can also maintain reasonable in IEQ P1 in order to calculate the Popul
Building envelope
CS-2009 EAp2:Minimum Energy Performanceposted by Frantisek Macholda on
Hello, we have a building with irregular shape of facade. The facade consists of horizontal lamellas with vertical gazing - like steps, 3 per each floor.
a site with no building
NC-2009 SSc2:Development Density and Community Connectivityposted by Noriko Nagazumi on
Hi, Our project will use option 1. The project site is located on industry development area nea bayside. There are some sites which have no building whithin the density radius of our project.
Metering Faucet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Dhanujie Jayapala on
Hi , We are using metering faucet for our project. Its unclear what kind of pressure is considered when calculating the water consumption for 12s cycle. Can you please specify that?
Revised Section 1.4 Form Units
NC-2009 EAp2:Minimum Energy Performanceposted by Aaron Luthien on
Hello, The new revised section 1.4 form asks the values in US units. Can we fill the form in SI units?
Material Costs for Assembled Curtain Wall Systems
NC-2009 MRc4:Recycled Contentposted by Chris Stronks on
Our company is a supplier of curtain wall systems to the glazing subcontractor.
Underground Parking
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Oliver Lange on
Our project consists of four individual residential buildings in an inner city area; the site was previously developed.