NC-2009 MRc4:Recycled Contentposted by Erin Holdenried on
If a project is not pursuing MRc3, can reused material count towards MRc4 instead?
LEED-CI 2009 SSc1 Option 2 Path 10
CI-2009 SSc1:Site Selectionposted by Nicholas Vreeland on
We are attempting SSc1 Option 2 Path 10 for a CI project within a CS registered building. My question is that the form provided for this credit automatically populated 30 sec.
Level of Detail for space usage type table
NC-2009 PIf3:Occupant and Usage Dataposted by Noriko Nagazumi on
Hi all, What level of detail do you generally use for completing the space usage type table? Do you write down room by room? Do you bundle up rooms by floor?
Excessive storm rainwater runoff
NC-2009 SSp1:Construction Activity Pollution Preventionposted by John Covello on
Hello, I have a question regarding silt and run off. Our project is located in Phuket Thailand.
Is the project located outside the U.S. and using a local equ...
NC-2009 SSc1:Site Selectionposted by Noriko Nagazumi on
Hi. The LEED Online form for this credit was updated recently and now international projects have to "Provide documents identifying how the local equivalent used is equivalent to the referenced".
check-offs on SSc5.2 form
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Denise Dauplaise on
The current version of the form for this credit has the statement "The LEED project does not include any buildings, hardscape, roads or parking areas built as part of the project on portions of the
Removal of Office/Open Office Trash Cans
EBOM-2009 MRp2:Solid Waste Management Policyposted by Zane Lichtneger on
I'm proposing to remove all office trash cans in the hopes to encourage more recycling.
Testing sampling location for independent ventilation system
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lilian Seow on
Each of the 400+ residential suites is designed with an independent stand-alone ventilation system. According to the air testing requirement in pp.
Public vs Private Lavatory Faucet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by LUCY WILLIAMS on
Hi, I am inquiring about the difference between private lavatory and public lavatory faucets.
Case 1 Option 2 Excessive stormwater runoff
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by John Covello on
Hello, We are pursing Option 2 for this project. Our stream channel protection will handle a 10 year storm event. How does the credit handle excessive storms, 50 or 100 year events?