Forum quick links
ASHRAE STANDARDS 90.1 Appendix G - Humidity Controls
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
Appendix G does not address humidity controls.
Leed Online Forms
NC-2009 MRc2:Construction Waste Managementposted by kelly saunders on
I'm not clear about using the LEED online forms. Are they supposed to filled in periodically and uploaded into the system or is this done at the end of the project when submitting for credits?
V4 WEc2 template issues
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Lianne Lami on
Our other online templates are working, but WEc2 seems to not function. we have achieved 76% water use reduction, but the template won't resolve for 2 points? thoughts?
What controls are required so autoshades can comply with credit?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Abena Darden on
We note that the prescriptive method for IEQc8.1 allows view preserving automated shades to be used as a glare control device, and that in the sidelighting section of theTable IEQ-1 spreadsheet, an
Two-story office building attached to warehouse
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Silvia Ruiz on
Hi, I am working on a project that consists of a two-story office building attached to a warehouse, both of which belong to the same owner.
Views in an operation control center
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Ahmed Hidayet on
Our project has an operation control center which is the largest office space in the project.
Projects on shared sites and Minimum s.f.
NC-2009 MPR7:Must comply with a minimum building area to site area ratioposted by Robyn Vettraino on
I have two buildings on a shared site.
major change in project boundary
ND-v2009 PIf2:Project Timelineposted by Emmanuel Pauwels on
Our project is contemplating LEED ND certification. The developer wants to keep his options open towards a potential sale of part of the project to another developer.
Renovated spaces or whole building for ASHRAE 62.1
CI-2009 IEQp1:Minimum IAQ Performanceposted by Matt Humphreys on
Hello, We have a project that consists of renovating 3 separate spaces in a large commercial building.
Feature lights
NC-2009 EAp2:Minimum Energy Performanceposted by Phillip Cook on
We have some external uplights that are used to light statues from below.