Zone isolation

NC-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

In an office building, shall meeting rooms (sporadically occupied within the schedule defined for the remaining occupied office areas) be considered an isolation zone according to ASHRAE 90.1 (2007

1
Tue Oct 22, 2013, 8:09 pm

Definition of Gross Floor Area for Data Centres

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Alicia Freire  on 

Does 'gross floor area' refer to total building (it is a data centre) or occupied space (ancillary area)? I.e. should the data halls be included?

1
Tue Oct 22, 2013, 4:23 pm

Energy modeling for Workshop Building

NC-2009 EAp2:Minimum Energy Performance
posted by  jane kane   on 

HI We have a workshop building targeting for LEED NC.

1
Fri Oct 25, 2013, 2:10 pm

Archaeological finds

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  FABIO VIERO  on 

We are looking for other LEED experiences regarding an unexpected discovered archaeological finds during the excavation inside the and how we can treat this argument for SSP1.

1
Wed Oct 23, 2013, 6:31 pm

ULEF Composite Wood

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Rachel Sowards  on 

After reading through the threads above, I didnt see a clear cut answer. Can I use ULEF composite wood on my LEEDv2009 job for IEQc4.4?

1
Wed Oct 23, 2013, 3:59 pm

surfaces of the zones

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

In my models (both proposed models and baseline models) the surfaces of the zones are from the inside edge of the external walls to the center of the internal partitions.

1
Thu Oct 24, 2013, 2:04 pm

IDc1.3

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Scott Volmer  on 

How do I get a LEED-EBOM 2009 SSc3 prerequisite form?

1
Fri Oct 25, 2013, 2:10 pm

VRP Compliance Calculator Error

Healthcare-v2009 IEQp1:Minimum indoor air quality performance
posted by  Kevin Chow  on 

I opted to use the LEEDonline provided VRP Compliance Calculator to show compliance with the IEQ p1. Upon completion of the form it says I am not compliant.

0

Separating lighting metering from plug load metering.

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Rudolph Carneiro  on 

I have seen many comments in this forum stating that plug loads should be metered seperately from lighting loads. I'm not sure if seperating these loads is actually necessary.

1
Fri Oct 25, 2013, 1:22 pm

Major refurbishment - existing building

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Alicia Freire  on 

Can this credit not be achieved in an existing building where one floor (not the top floor) is being assessed and the existing roof will be left untouched?

1
Fri Nov 1, 2013, 1:51 pm