Forum quick links
Designated Storage Area(s)
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Julia Ellrod on
Could someone please clarify the following for me?
Dual Flush Toilets
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by LUCY WILLIAMS on
We have a project registered with LEED-EB O&M 2009. There are dual flush toilets in the facility.
Loose Furniture and Systems Furniture - Textiles/Upholsteries
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Becky Baumer on
My interpretation of this credit is that all upholsteries/textiles that are applied to loose furniture and systems furniture are included in this credit as well.
Site plan diagram for shading
Healthcare-v2009 SSc7.1:Heat island effect - nonroofposted by Michael Brown on
If we are trying to get Option 1 Site Hardscape. A combination of shading, high reflectance, and/ or open grid paving is provided for at least 50% of the site hardscape.
Required submittals of EAp2 contain same details
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir/madam, For the submittal of credit EAp2, the revised Section 1 4 Tables have included all the input parmeters,should we still submit the input summary files?
Base case and proposed case modeling
NC-2009 EAp2:Minimum Energy Performanceposted by CONSTANZA CATTAN on
At he moment, we are modeling a buried building with a green roof (as part of the energy efficiency strategy) according to the appendix G of the ASHRAE standard 90.1 (2007) The question regards the
SS5.1: Obtaining credit for area that was wooded/grass
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Peter Lindabury on
Our project is an addition on a hardscape site. The client owns land across the driveway from the building site that is partially wooded with some grass.
Used Furniture
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Gavin Simone on
Can the purchase of used furniture count towards this credit? If yes, how old does the furniture have to be?
Section 1.4 Tables - Table 1.4.2A (Vertical Glazing)
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
Table 1.4.2A (Shading & Orientation) asks for the Above-Grade Wall & Vertical Glazing Area by Orientation.
Pilot credit 10 vs. WEc2:Innovative Wastewater Technologies
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Anna Korinkova on
I'm glad to know that the USGBC is trying to promote use of non-potable water sources since my clients are usually more willing to invest money in stormwater detention features.