Forum quick links
Homeless Shelter patrons FTE vs Residential classification
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Maria Fiorelli on
We are running preliminary water calculations to verify that we meet the WEp1 requirements. The project will have 2 usage groups, the homeless patrons and the staff.
Sample Templates not working
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Kathleen Gaffney on
Has anyone else noticed that the sample template downloads isn't working. The page is blank? Neither the link from here or directly from LEED Online.
Hot Water Energy Consumption in big buildings
CS-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Good evening, I have a question regarding a situation that I have encountered in more than one project: Suppose that for a big shopping mall there is a hot water demand for fast food areas and sh
Type and sub-type area matrix IEQ EBOM
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Hector Miranda on
I have a question if a have in an EBOM project and this project isn´t an industrial facilities area ,but I have much inactive storage, is the space not included in the IEQp1 credit requirements?
Cork FSC certified?
NC-2009 MRc7:Certified Woodposted by Mario Pinoli on
Hi all, I would like to suggest an acoustic insulation in cork, but I’d like to share my opinion if consider or not cork as wood, to determine if include this materials in credit MR7. FSC consider
How to claim savings for Equipment Power Density in LEED project
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by J I on
Currently I'm working on a commercial building compliance modeling for LEED CS program.
Faucets with Sensors
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by J Douglas Dietrich on
If we are installing low-flow faucets with vandal-proof aerators and sensors such that the water flow stops when a user's hands are not near the faucet, how should we account for that in the LEED t
Surfaces
Pilot-Credits EQpc22:Interior lighting - qualityposted by William Kelly on
We are appling for PC22 Lighting Quality. Regarding the requirements of Strategy E and Strategy F, what are the surfaces that are to be documented?
10% exclusion of square footage "defined" for EBOM credits
NC-2009 PIf2:Project Summary Detailsposted by Wendy Parker, LEED AP on
Does the 10% excluded square footage for one credit (allowed in EBOM 2009) have to be the same excluded square footage used in another credit?
four IEQc3.2 questions....
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Carrie Laurendine on
1) ive looked at space matrix (this is a library project)... from what i gather EVERY space has to count.. even spaces not regularly occupied (mech closet, janitor closet, etc).