Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Homeless Shelter patrons FTE vs Residential classification

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Maria Fiorelli  on 

We are running preliminary water calculations to verify that we meet the WEp1 requirements. The project will have 2 usage groups, the homeless patrons and the staff.

1
Thu Nov 7, 2013, 1:33 am

Sample Templates not working

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Kathleen Gaffney  on 

Has anyone else noticed that the sample template downloads isn't working. The page is blank? Neither the link from here or directly from LEED Online.

1
Wed Nov 6, 2013, 7:57 pm

Hot Water Energy Consumption in big buildings

CS-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Good evening, I have a question regarding a situation that I have encountered in more than one project: Suppose that for a big shopping mall there is a hot water demand for fast food areas and sh

1
Wed Nov 6, 2013, 8:34 pm

Type and sub-type area matrix IEQ EBOM

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Hector Miranda  on 

I have a question if a have in an EBOM project and this project isn´t an industrial facilities area ,but I have much inactive storage, is the space not included in the IEQp1 credit requirements?

1
Fri Dec 20, 2013, 5:55 pm

Cork FSC certified?

NC-2009 MRc7:Certified Wood
posted by  Mario Pinoli  on 

Hi all, I would like to suggest an acoustic insulation in cork, but I’d like to share my opinion if consider or not cork as wood, to determine if include this materials in credit MR7. FSC consider

1
Thu Nov 7, 2013, 3:22 pm

How to claim savings for Equipment Power Density in LEED project

Pilot-Credits EApc3:Medical and process equipment efficiency
posted by  J I  on 

Currently I'm working on a commercial building compliance modeling for LEED CS program.

0

Faucets with Sensors

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  J Douglas Dietrich  on 

If we are installing low-flow faucets with vandal-proof aerators and sensors such that the water flow stops when a user's hands are not near the faucet, how should we account for that in the LEED t

1
Thu Nov 14, 2013, 9:09 pm

Surfaces

Pilot-Credits EQpc22:Interior lighting - quality
posted by  William Kelly  on 

We are appling for PC22 Lighting Quality. Regarding the requirements of Strategy E and Strategy F, what are the surfaces that are to be documented?

1
Wed Nov 20, 2013, 6:53 pm

10% exclusion of square footage "defined" for EBOM credits

NC-2009 PIf2:Project Summary Details
posted by  Wendy Parker, LEED AP  on 

Does the 10% excluded square footage for one credit (allowed in EBOM 2009) have to be the same excluded square footage used in another credit?

1
Fri Nov 22, 2013, 6:26 pm

four IEQc3.2 questions....

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Carrie Laurendine  on 

1) ive looked at space matrix (this is a library project)... from what i gather EVERY space has to count.. even spaces not regularly occupied (mech closet, janitor closet, etc).

1
Sat Nov 16, 2013, 2:07 am