Deciding to choose Option 1(D) or Option 2(B)

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  James Keohane  on 

I am trying to think thru and identify the first cost difference of Option1(IPMVP Option D) or Option 2 ( IPMVP Option B). For a new office building, 100,000s.f.

1
Wed Nov 13, 2013, 2:31 pm

VAV System with Reheat

NC-2009 EAc5:Measurement and Verification
posted by  Maya Karkour  on 

Dear All, We have a project installing a VAV air conditioning system with electrical reheat boxes in each zone. The current design assigns energy submeters combining both the electrical reheat wi

1
Wed Nov 13, 2013, 2:51 pm

Building Envelope Commissioning

Healthcare-v2009 EAc3:Enhanced commissioning
posted by  Kerrie Racicot  on 

BECx can be wide open when it comes to scope. Is there some guidance regarding the scope that LEED is looking for? Thank you,

0

Proper way to apply ASHRAE 62.1 to baseline model?

Schools-2009 EAp2:Minimum Energy Performance
posted by  Joseph Lewis  on 

I have a project where the proposed design has demand controled ventilation.

1
Wed Dec 4, 2013, 1:14 pm

mercury in specialty lamps (animal care)

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Saju Varghese  on 

We are having an issue because some animal care lamps of our project do not really disclose the mercury content of the lamps since they consider it as some part of their copyright of some sort.

0

comprehensive transportation management plan

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Nilo Regojo  on 

Our project complies with Option 2 - Bus Stop Proximity.

1
Mon Dec 2, 2013, 2:09 pm

LEED HC WE p1 - Process water use terminology

Healthcare-v2009 WEp1:Water use reduction
posted by  Sasha Peters  on 

Can someone please tell what is the meaning of "ADO" as mentioned in the LEED HC template WE p1 - Process water use reduction? It seems to be a value affecting total water use. Thanks.

1
Thu Nov 14, 2013, 2:23 pm

Multi Layered App-Shop Primer-Primer-Topcoat VOC Numbers

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Nilufer Senses  on 

We have multi-layered, anti-corrosive coating application for the steel structural elements in the interior. Layering is like this: Shop Primer, Primer and Top Coat.

1
Thu Nov 14, 2013, 2:44 pm

Process Energy

CI-2009 EAp2:Minimum Energy Performance
posted by  Graham Langton  on 

All, How does LEED CI and section 11 modelling view process energy? For an industrial / manufacturing facility with new process equipment in particular. In 90.1, process energy is not dealt with.

1
Thu Nov 14, 2013, 6:02 pm

Clarification for LEED CI

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Rebekah Burke  on 

If we are doing a tentant improvement for the entire interior of a building, is it eligible to be certified under LEED-CI.

1
Mon Dec 2, 2013, 3:59 pm