Forum quick links
Deciding to choose Option 1(D) or Option 2(B)
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by James Keohane on
I am trying to think thru and identify the first cost difference of Option1(IPMVP Option D) or Option 2 ( IPMVP Option B). For a new office building, 100,000s.f.
VAV System with Reheat
NC-2009 EAc5:Measurement and Verificationposted by Maya Karkour on
Dear All, We have a project installing a VAV air conditioning system with electrical reheat boxes in each zone. The current design assigns energy submeters combining both the electrical reheat wi
Building Envelope Commissioning
Healthcare-v2009 EAc3:Enhanced commissioningposted by Kerrie Racicot on
BECx can be wide open when it comes to scope. Is there some guidance regarding the scope that LEED is looking for? Thank you,
Proper way to apply ASHRAE 62.1 to baseline model?
Schools-2009 EAp2:Minimum Energy Performanceposted by Joseph Lewis on
I have a project where the proposed design has demand controled ventilation.
mercury in specialty lamps (animal care)
EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lampsposted by Saju Varghese on
We are having an issue because some animal care lamps of our project do not really disclose the mercury content of the lamps since they consider it as some part of their copyright of some sort.
comprehensive transportation management plan
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Nilo Regojo on
Our project complies with Option 2 - Bus Stop Proximity.
LEED HC WE p1 - Process water use terminology
Healthcare-v2009 WEp1:Water use reductionposted by Sasha Peters on
Can someone please tell what is the meaning of "ADO" as mentioned in the LEED HC template WE p1 - Process water use reduction? It seems to be a value affecting total water use. Thanks.
Multi Layered App-Shop Primer-Primer-Topcoat VOC Numbers
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Nilufer Senses on
We have multi-layered, anti-corrosive coating application for the steel structural elements in the interior. Layering is like this: Shop Primer, Primer and Top Coat.
Process Energy
CI-2009 EAp2:Minimum Energy Performanceposted by Graham Langton on
All, How does LEED CI and section 11 modelling view process energy? For an industrial / manufacturing facility with new process equipment in particular. In 90.1, process energy is not dealt with.
Clarification for LEED CI
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Rebekah Burke on
If we are doing a tentant improvement for the entire interior of a building, is it eligible to be certified under LEED-CI.