Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bicycle Racks

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Jose Ng  on 

Hi LEED User team, We´re working on a CI project that is build on a CS pre-certified building (the building is not finished yet).

1
Fri Dec 20, 2013, 11:27 pm

Updated SF Pesticide Hazard Screening List

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Trista Brown  on 

Heads up that an updated list came out in September 2013 and can be accessed here - www.sfenvironment.org/sites/default/files/fliers/files/sfe_th_pesticides_reviewed_091313.pdf We'll be updating

1
Fri Dec 20, 2013, 6:13 pm
1
Mon Nov 25, 2013, 4:31 pm

EPA DFE

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Elizabeth Felder  on 

Would window washing products (dish soaps) that have the US EPA Design for the Environment label count as compliant for SSc2?

1
Mon Nov 25, 2013, 8:18 pm

Chamber Concentration or indoor air concentration?

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Qiang Peng  on 

I have a SGS test report of several furniture using ANSI/BIFMA M7.1-2007 method. The test results have two different table.

1
Fri Dec 20, 2013, 4:36 pm

European Testing Laboratories

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Jaida Anderson-Lozano  on 

I had become frustrated with the lack of a database of European testing laboratories so I created my own.

1
Tue Jan 14, 2014, 8:59 am

Drawings

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Courtney Royal  on 

Is it acceptable to just upload a drawing with the erosion and sedimentation control measures or is it required to have an actual ESC plan as well?

1
Mon Nov 25, 2013, 7:26 pm

Commissioning on Multi-Family Building (Residential)

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Saju Varghese  on 

How does the commissioning process work on a multifamily residential building? Does each residential unit have to be checked? or is it just the a certain number of them?

1
Tue Dec 3, 2013, 12:19 am

Exhaust and Outdoor Air

NC-2009 EAc1:Optimize Energy Performance
posted by  Ramana Koti  on 

Dear All, We're working on the certification of a restaurant where the kitchen has an outdoor air (OA) rate of 2350 CFM, supply air at 8000 CFM, and an exhaust rate of 3675 CFM.

1
Tue Dec 3, 2013, 3:35 pm

Documentation

NC-2009 MRc7:Certified Wood
posted by  Caroline O'Leary  on 

I just looked through the comments/questions for a few pages and didn't see this question.

1
Tue Nov 26, 2013, 1:16 am