Forum quick links
Bicycle Racks
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Jose Ng on
Hi LEED User team, We´re working on a CI project that is build on a CS pre-certified building (the building is not finished yet).
Updated SF Pesticide Hazard Screening List
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Trista Brown on
Heads up that an updated list came out in September 2013 and can be accessed here - www.sfenvironment.org/sites/default/files/fliers/files/sfe_th_pesticides_reviewed_091313.pdf We'll be updating
Group 2 - Wall and Ceiling Finishes testing standards
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Amy Merrell on
We manufacture rigid sheet wall covering.
EPA DFE
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Elizabeth Felder on
Would window washing products (dish soaps) that have the US EPA Design for the Environment label count as compliant for SSc2?
Chamber Concentration or indoor air concentration?
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Qiang Peng on
I have a SGS test report of several furniture using ANSI/BIFMA M7.1-2007 method. The test results have two different table.
European Testing Laboratories
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Jaida Anderson-Lozano on
I had become frustrated with the lack of a database of European testing laboratories so I created my own.
Drawings
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Courtney Royal on
Is it acceptable to just upload a drawing with the erosion and sedimentation control measures or is it required to have an actual ESC plan as well?
Commissioning on Multi-Family Building (Residential)
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Saju Varghese on
How does the commissioning process work on a multifamily residential building? Does each residential unit have to be checked? or is it just the a certain number of them?
Exhaust and Outdoor Air
NC-2009 EAc1:Optimize Energy Performanceposted by Ramana Koti on
Dear All, We're working on the certification of a restaurant where the kitchen has an outdoor air (OA) rate of 2350 CFM, supply air at 8000 CFM, and an exhaust rate of 3675 CFM.
Documentation
NC-2009 MRc7:Certified Woodposted by Caroline O'Leary on
I just looked through the comments/questions for a few pages and didn't see this question.