Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Recycle area with mezzanine

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Gabriela Hernández Castillo  on 

Hello, we are locating our recycling area at the underground parking lot.

1
Fri Dec 20, 2013, 11:02 pm

IEQp1 LEED Online form what to input?

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Kasandra Martin  on 

For ASHRAE 62.1 do I upload forms for the Baseline of meeting ASHRAE 62.1 and not my forms for IEQc2 Increased Ventilation? Table IEQp1-3.

1
Fri Dec 20, 2013, 11:30 pm

Landscaped park across from project building

NC-2009 WEc1:Water Efficient Landscaping
posted by  Alfred Servodidio  on 

Our project is an historic building in downtown NYC. The owners of the building are contributing to the restoration of the small park directly across the street from the building.

1
Wed Dec 11, 2013, 5:35 pm

High performing existing baseline building.

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Steven Beccia  on 

Hello All, I am looking to get some clarification or consensus regarding modeling the baseline HVAC systems for EAc1.3. My specific scenario is that we have a core and shell building, under const

1
Tue Dec 31, 2013, 4:31 pm

Renovation project and LEED certification of the addition only

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  John Smith  on 

Quick question please: I have an existing building of 1000 sq ft. 700 sq ft of them are to be renovated, the remaining area is to left intact. There will also be a brand-new addition of 500 sq ft

1
Thu Dec 12, 2013, 3:01 am

Nature Trail

Healthcare-v2009 SSc9.1:Connection to the natural world - places of respite
posted by  Marissa Hebert  on 

If you use a universal access nature trail as part of your Places of Respite, does the trail have to provide shaded seating?

1
Tue Feb 18, 2014, 10:22 pm

Simulation approach strategy.

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  TOMAS URIBE  on 

Hello Marcus. We have a project that will be applying for LEED certification under CI. The project is located on 4th floor within an office building with 5-floors.

1
Tue Dec 31, 2013, 4:38 pm

ASHRAE 90.1-2007 - 6.4.3.1.1 COMPLIANCE CRITERIA

CI-2009 EAp2:Minimum Energy Performance
posted by  RICARDO HERNANDEZ  on 

Does anyone know how stringent is the criteria to achieve compliance with the 6.4.3.1.1 Zone Thermostatic Controls for a Commercial Interiors?

1
Tue Dec 31, 2013, 3:50 pm

Redrawing Project Boundary AFTER Initial Review

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  C.M. G.  on 

Hello, We are currently preparing our project for final review, and realized that that we drew our project boundary in such a way that disqualifies us from SSc8.

1
Mon Dec 23, 2013, 7:31 pm

Where are the Import Facility Data Templates?

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Lewis Hewton  on 

Can somebody please direct me where to find the 'import facility data' templates on the Energy Star website?

1
Thu Dec 12, 2013, 11:07 pm