Can A project Team Perform that credit

Schools-2009 SSp2:Environmental Site Assessment
posted by  soha yamani  on 

I'm Having the same problem in a project in Egypt , as Ministry of Environment only provide Environmental Impact Assessment which is totally different from Environmental site assessment , and i cou

1
Tue Dec 17, 2013, 4:53 pm

IEQp1 online form

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Kasandra Martin  on 

I have input my info but it is not complying with IEQc2. Do the uploaded forms need to be pre-approved before it will comply? Also do I need to fill out the Appendix?

1
Sat Jan 25, 2014, 2:22 am

Separate green roofs, separate systems

CS-2009 WEc1:Water Efficient Landscaping
posted by  Monica Alicea  on 

Hi, If there are two areas in the building that will be irrigated by two separate systems, how can this be taken into acount in the LEED template to calculate if 100% potable water is being saved?

1
Fri Dec 20, 2013, 11:09 pm

LEED NCv3 Project Boundary in 3 Dimensions

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Sara Goenner Curlee  on 

Hello, I am reposting this question, hoping to get a response. It was under PIf2, but maybe this is the better area to post it.

1
Sat Dec 21, 2013, 3:41 am

Electric Vehicle Charging

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Jonathan Weiss  on 

I am looking to use Electric Charging stations to meet option 2 of this credit - are there any requirements about location? They don't need to be "preferred," do they?

1
Tue Dec 17, 2013, 5:31 pm

Background Noise Measurements

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Brian Homans  on 

For a recently-constructed school, are sound level measurements permissible in lieu of calculations? I recall that this was a path in LEED for Schools 2007.

1
Thu Dec 19, 2013, 7:12 pm

MRpc69 was easy to achive with a little planning up front.

Pilot-Credits MRpc69:Construction and demolition waste management
posted by  Joseph Haupt  on 

The current thresholds were easy to achive as long as you clearly identify what material streams the project is planning to recycle and you have someone in charge or monitoring the construction deb

0

Clarification on open space with 2 work areas.

CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Kasandra Martin  on 

So if I have a large room with 2 work spaces, a short dividing wall between. Is that considered an open plan work station for Individual Thermal Comfort? Or a shared multi occupant?

1
Thu Dec 19, 2013, 12:58 am

Greenhouse energy consumption

NC-2009 EAc1:Optimize Energy Performance
posted by  Karl Heitman  on 

We are working on a factory in Chicago which will have food producing greenhouses on the roof.

1
Tue Dec 17, 2013, 9:19 pm

Smoking 25 feet from operable windows

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Anna Dengler  on 

Our building has a no smoking policy and will be posting no smoking signage at all entrances "No smoking within 25 feet of building entrance." However, the windows on the second floor are operable

1
Mon Dec 23, 2013, 6:00 pm