Forum quick links
Hello, regarding my previous
NC-2009 EAc2:On-Site Renewable Energyposted by Gabriele Polenta on
Hello, regarding my previous post I have one more doubt: having the building with a biomass system, in EAc1 when calculating the thermal energy do I have to use the local gas cost or the local biom
biking line
Pilot-Credits PC14:Walkable Streetsposted by Lily Li on
The building is parallel to the street, cross street it's a biking line, can this still count towards the credit, please advise.
Undeveloped vs. Greenfield
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Michelle Rosenberger on
One of our warehouse projects is the fifth phase of an existing development.
CO2 sensors in duct work
Schools-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Todd Bundren on
The mechanical engineer who designed our heating / cooling system placed the CO2 sensors for the gymnasium (with bleachers) in the return ducts.
Baseline of NPDc8
ND-v2009 NPDc8:Transportation demand managementposted by Jie Xiong on
Hi For this credit, it says that create a TDM program for the project to reduce 20% at least weekday peak-period motor vehicle trips compared with a baseline case. So what is the baseline case?
Exemplary Performance
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Wayne DeFeo on
On the form it notes that for exemplary performance we have to show that we are within 1/2 mile of at least 2 existing commuter rail, etc….and/or within 1/4 mile of at least 2 stops for 4 or more…b
Clarification on SS Credit 5.2
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Emmanuel Gee on
Our project is in a dense urban area and we will meet the guidelines for SS Credit 2.
Eucalyptus - Rapidly Renewable
CI-2009 MRc6:Rapidly Renewable Materialsposted by Vivian Tazima on
Hi, I have a project that uses MDF for furniture manufacturing. Here in Brazil the MDF are 100% virgin materials - derived from the eucalyptus reforestation. There are studies showing that the euca
Pre construction ductwork cleaning
NC-2009 IDc1:Innovation in Designposted by Cynthia Kaplan on
My project is a full renovation of a 1920's high school for use as a new middle school. The owner ordered a full video inspection of the existing ductwork.
Applying the 0.5 gpm limit to toilets embedded in departments
Healthcare-v2009 WEp1:Water use reductionposted by Kim Shinn on
There is a discussion string under the LEED HC 2009 WEc3 credit forum about whether or not faucets in toilet rooms that are embedded in clinical departments (imaging, lab, therapy) should or should