Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

72 Hour Universal Notification conflicts with weather patterns?

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Heather DeGrella  on 

I'm working with a Community College that has numerous campuses in the Portland, Oregon area to submit IEQc3.6 as an ID credit for LEED NC.

1
Thu Jan 23, 2014, 2:47 pm

Pilot Credit 34 Update

Pilot-Credits PC34:Design for Adaptability
posted by  Sandy Chung  on 

Be sure to use the Updated version 8/1/2011. The required features are in line with the California Building Code Accessibility requirements.

0

Subtracting built-in furniture/casework from square footage

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  American University  on 

We've had a designer tell us that built-in furniture and case work (like a fan-coil unit enclosure) can be deducted from the square footage of a room when calculating the window opening requirement

1
Thu Jan 23, 2014, 9:28 pm

Site Lighting for Campus Plan

CS-2009 EAp2:Minimum Energy Performance
posted by  charles bell  on 

Hello, We have a campus application for our 3 mixed-use buildings. We are now on our final review and need to modify our submittal.

1
Fri Jan 24, 2014, 3:02 pm

Help with table G3.1.1A,B

CS-2009 EAp2:Minimum Energy Performance
posted by  charles bell  on 

The project consists of non residential building of 6 stories.

1
Fri Jan 24, 2014, 3:13 pm

Recertification - Changed Cleaning Contractors

EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipment
posted by  Greengrade User  on 

For a recertification, if the building management switches cleaning contractors partway through the performance period, and now completely different cleaning equipment is being used at the building

1
Thu Feb 6, 2014, 11:19 pm

Blue Roof

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Jamison Hill  on 

As part of NYC's blue roof requirement, roofs must provide 24 hour detention detention for the 2-yr design storm and an equivalent peak runoff rate equal to a curve # of approx 50 for projects disc

1
Thu Jan 23, 2014, 10:40 pm

Core and Shell minimum occupancy

NC-2009 MPR5:Must comply with minimum occupancy rates
posted by  Vada Kornegay  on 

It seems clear but, to be certain, can a core and shell project have an occupancy of less than 50%?

1
Fri Jan 24, 2014, 4:38 am

What shell I do?

EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumables
posted by  Taygun Yüksel  on 

Hi there, I would like to ask a question about this credit scope. We have EBOM Coca Cola factory project in Turkey.

1
Mon Jan 27, 2014, 2:26 am

Facade lighting for advertising

CS-2009 EAp2:Minimum Energy Performance
posted by  Lolita Wu  on 

We have a question about facade lighting for a retail project. As the mandatory requirement, building facade lighting shall not exceed 0.2W/ft2 for each illuminated surface.

1
Mon Jan 27, 2014, 3:22 pm