Typo in the Bird's eye view: 10 fc - not 25 fc?
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Diana Nezamutinova on
Isn't the requirement for daylight to have 10 fc, not 25 fc as stated in the EBOM IEQc2.4 Bird's view? Thank you.
Tenant switch in a EBOM certified building
CI-2009 PIf5:Previously LEED Certified Detailsposted by Mathilda Jonsson on
Hi all My project is LEED EBOM certified since 2010. In summer the current tenant are moving out and a new one will move in.
Ceramic tiles vs FloreScore
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Catharina B on
Hi I’m a little bit confusing, please correct me. On my LEED CS v2009 ceramic tiles, stone and resin will be installed part of the CS scope of works.
Legacy LEED AP
Healthcare-v4 INc2:LEED Accredited Professionalposted by Catherine Blakemore on
Can folks with Legacy LEED AP status be the LEED AP for projects and fulfill the requirements of this credit?
Water Use Reduction points
NC-v4 WEp1:Outdoor water use reductionposted by UGC/GPRO Office Account on
Hi All, I am gathering all the water use reduction points in v4.
multifamily building
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Courtney Royal on
If i have a multifamily building with a common laundry room and say the housekeeping supplies will be kept in a separate janitorial storage closet elsewhere in the building, do both of these spaces
Siting electric charging stations outside LEED boundary
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by GTF CPRE on
I'm working on a campus student union, with only a few parking spaces within the LEED boundary.
Furniture not included
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Vada Kornegay on
I have a project where the furniture was not included in the base contract and the contractor therefore did not include it in the material costs for the project.
Automatically adjust dampers
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Magda Aghababyan on
Dear all, If the system can automatically adjust the dampers when the CO2 levels vary by +/-10% (instead of the alarm) will it be acceptable for the credit? Thank you.
Toolkits for v4
NC-v4 MRc1:Building life-cycle impact reductionposted by Linda Deatrick on