Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Commercial buildings?

EBOM-v4 EQp2:Environmental Tobacco Smoke Control
posted by  Jonathan Miller  on 

Are commercial buildings exempt from this prerequisite due to the "residential only" language? Thanks!

1
Mon Feb 10, 2014, 6:14 pm

LEED-NC MPR #6, Sharing Whole-Building and Water Usage Data

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Greengrade User  on 

We have a building that will be connected to a central Biomass Steam Plant for heating the heat pump water and providing steam to the kitchen and a future laundry.

1
Mon Feb 10, 2014, 8:17 pm

LEED DESv2, System 8 and Chilled Water Temp Reset

CS-2009 EAp2:Minimum Energy Performance
posted by  Matt Humphreys  on 

For baseline HVAC system #8 modeled with purchased chilled water according to Option 1 of Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 guideline, does the Chilled-Water S

1
Tue Feb 11, 2014, 3:23 pm

Calculating new Construction and existing renovated GFS

NC-2009 PIf2:Project Summary Details
posted by  Alfred Servodidio  on 

On our project we are removing all of the floors, roof and basement slabs to be replaced with new.

1
Sat Feb 22, 2014, 7:04 pm

Definition of supermarket for SS C2 option2 credit

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Rosemary Muller  on 

Is there a definition of what can be counted as a "supermarket" instead of just a "convenience grocery"? What features is a "supermarket" required to have?

1
Tue Feb 11, 2014, 2:27 pm

construction site facilities outside of LEED project boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Doreen Kruschina  on 

Hi, working on an industrial plant located on previous farmland the developer has leased some additional lands where he´s put the site facilities.

1
Tue Feb 11, 2014, 1:08 pm

LEED EB O&M Project Boundary

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Sathish Kumar  on 

There are 3 buildings in a single site and these 3 buildings have a shared basement parking.

1
Mon Feb 24, 2014, 3:04 pm

high - rise residential building??

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Davide Filippi  on 

From the supplemental Guidance resion 2: "LEED projects must include the new, ground-up design and construction, or major renovation, of at least one commercial, institutional, or high - rise resi

1
Tue Feb 11, 2014, 9:54 pm

Stand Alone Building or Campus?

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Jennifer Sutherby  on 

Hi All, I am attempting the ITE study for a research building with below ground parking located on a hospital campus.

1
Tue Feb 18, 2014, 2:22 pm

Fire station fixture uses

NC-2009 WEc3:Water Use Reduction
posted by  Mary Lea Tucker  on 

Would back of house (non public) fixtures in a fire station be considered residential fixtures?

1
Fri Mar 7, 2014, 10:12 pm