outdoor air rate in area where uses demand control strategy
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir, in our project,the meeting room uses CO2 sensor to control the outdoor rate and the parking garage uses CO sensor to control the outdoor rate.
Exterior covered spaces
Schools-2009 SSc7.1:Heat Island Effect—Nonroofposted by Esmeralda Ward on
Hello, Could someone please clarify where exterior hardscape spaces that are covered by the building roof should be counted?
Renovate an old school
Schools-EBOM-v4 MPR3:Must comply with project size requirementsposted by Davide Filippi on
I'm working to certify a school in LEED EB:OM v4.
after the first review,change the energy modeling softare.
CS-2009 EAp2:Minimum Energy Performanceposted by tiantian zhou on
Dear sir, some problem occured to our project when we made the second submission. We have to change the energy modeling softare and remodel. Is it ok?
vehicle travel way-definition
Pilot-Credits PC14:Walkable Streetsposted by Anna Bak on
Hi, we have one project that meets all SSpc14 credit requirements but street trees. One side of the building (not the main entrance) is located by the on-site car park.
Project Boundary
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ahmed Mian on
Hi. We are trying to assess the feasibility for LEED certification for a factory to be constructed on a developed footprint of 1.5 Acres on a site measuring 33 Acres.
Dear all,
Hi.
For LEED NC
NC-2009 EAp2:Minimum Energy Performanceposted by Thais Inatomi on
Dear all, Hi. For LEED NC certification, I’m modeling a building with 03 floors and less than 14.000 m² conditioned floor area.
shgc Values
NC-2009 EAc1:Optimize Energy Performanceposted by TOMAS URIBE on
Hello Marcus. The fenestration supplier of a project gave us SHGC values from a simulation. We would like to know if it is acceptable for LEED simulation.
CitiBike- Bicycle Commuting SS c4-3
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Alfred Servodidio on
Our project in NYC has a Citi Bike location less than 200 yards from the entrance. The owner will pay for up to 80% of the annual cost for all employees.
Building Demolition
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Chris Eger on
We are demolishing a large building that is no longer in use and is twice the size of an existing portion being retained.