Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Using the calculator (continued)

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Christina Reeves  on 

Hello again, We now have the 62MZ spreadsheet working (thanks again!), but a few more questions have come up as our ME works through it. Can anyone provide some insight on these? 1.

1
Thu Feb 13, 2014, 6:02 pm

Tenant Metering Questions

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Marina Andrade  on 

Hi, I'm working on a project that has many storage modules that will be occupied by tenants.

1
Thu Feb 13, 2014, 4:05 pm

Rebar - Offsite Scrap Recycling

CS-2009 MRc2:Construction Waste Management
posted by  Roberto Meza  on 

Hello, We have an interesting situation at a large project, Rebar is being bought from a company which at the same time offers to bend it into the various figures needed for columns etc.

1
Mon Feb 17, 2014, 5:26 pm

EAp2 form issue on table 2-6

CS-2009 EAp2:Minimum Energy Performance
posted by  charles bell  on 

Our project is a CS mixed use: hopefully this is not too general a question. We cannot get the table EAp2-6 to pull down results from the previous tables.

1
Mon Feb 17, 2014, 4:38 pm

Cold, dark warehouse, round 3 (at least)

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Tiffany Moore  on 

I just received review comments back on MRp1 that I simply can't validate. I'd appreciate any help or advice that might be out there.

1
Thu Feb 13, 2014, 11:41 pm

Pool

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Jorge Lopez de Obeso  on 

If SSc2 is achieved, would a swimming pool count towards credit achievement? I´d think so, however I read other posts and there is a comment that says no... Does anyone have a positive feedback a

1
Fri Feb 14, 2014, 1:42 am

temporized faucet

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  LEEDme Lorenzi  on 

The water use reduction additional guidance says: the flow rate is determined using the flow rate in gallons per minute (gpm) and the duration setting (in seconds) for the metering faucet.

1
Fri Feb 14, 2014, 12:45 pm

Coconut Fiber

NC-2009 MRc6:Rapidly Renewable Materials
posted by  María Fernanda Aguirre  on 

Hi! Can coconut fiber count as both, recycled content (pre-consumer if coming from coconut sub-products industrial process) and a rapidly renewable material as well?. Thanks

1
Mon Feb 24, 2014, 12:30 pm

LEED CI Project Boundary - Non-conjoining Spaces

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Matthew Catterall  on 

We have a project for a single entity that owns and occupies an entire building. They are required to achieve LEED silver on this renovation per their local code.

1
Sat Mar 8, 2014, 3:34 am

CAPP Plan

NC-v4 SSp1:Construction activity pollution prevention
posted by  UGC/GPRO Office Account  on 

Hello, Does anyone have a Construction Activity Pollution Prevention plan example? What does it include? Erosion control, light pollution prevention, stormwater management plan

1
Fri Mar 7, 2014, 4:11 pm