Forum quick links
Multiple Buildings
EBOM-v4 WEc2:Indoor water use reductionposted by Jonathan Miller on
How do we handle multiple buildings being submitted for LEED certification together as part of a campus?
Increased Ventilation
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Farah A. on
I am stuck on this LEED BD+C question. The future building tenant decides to increase the outdoor air ventilation rates by 30% compared to the ASHRAE 62.1-2007 standard in a mechanically ventilate
Commissioning performed by Owner - Contract Document?
NC-2009 EAc3:Enhanced Commissioningposted by Charline SEYTIER on
In one of our projects the owner is willing to perform Fundamental and Enhanced Commissioning having one of their engineers that has the proper experience work on it. They are wondering what would
Signage location requirements for Carpool/Vanpool and LEV
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Ashley Love on
If this question has been asked previously, I apologize I didn't see it.
Tough to do with natural ventilation
NC-2009 IEQc2:Increased Ventilationposted by Jean Marais on
I'd just like to post my agreement to your assesment in the bird's eye view.
Multifamily with curtainwalls
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
If you have a multi-family building with curtain walls can it still meet the requirements for the energy model? How should the baseline be done?
Mech. exhaust fan required for a naturally ventilated project?
CI-2009 IEQp1:Minimum IAQ Performanceposted by Ron Dean on
I'm working in a small project with natural ventilation overall. Considering these 3 facts: 1. LEED states to comply with sections 4-7 of ASHRAE 62.1-2007. 2.
Continuous insulation definition
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello, We have a project where our resort rooms will be using spray foam insulation above a concrete slab, set in zone 1. Our rooms are actually small villas.
CxA's commissioning activities
CI-2009 EAc2:Enhanced Commissioningposted by Bilge Ceylan on
The owner in my CI project is planning to appoint the operations and maintenance (O&M) firm as the CxA to achieve this credit.
Once Through Cooling
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Farah A. on
Can cooling equipment with once through cooling, that utilizes NONPOTABLE water, be applicable for this credit or is it also ineligible? Could not locate this in the reference guide