Integrative Process

Pilot-Credits PC60:Integrative Process
posted by  Janna Alampi  on 

Building design should always be an integrative process. The tools found in this Pilot Credit would benefit any project.

1
Thu Mar 6, 2014, 6:10 pm

Water cooled chillers for very dry areas

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Dear forum, We have a very critical problem for a LEED C&S 2009 project located in the north of Mexico. The project will be a 13th story office building.

1
Wed Feb 26, 2014, 6:42 pm

What about metal structure or legs of workstation?

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Jim Park  on 

One project is purchasing Greenguard certified workstation (panel), however my client told me that the metal legs are going to be provided by other vendor.

0

Non-FSC Certifications?

NC-2009 MRc7:Certified Wood
posted by  Andrea Anderson  on 

We have had a wood submittal that has a several green certifications including NGBS Green Certification, SCS EPP Certification, and UL Greenguard Gold Certifications.

1
Wed Feb 26, 2014, 7:43 pm

Option 2: Prescriptive Method Skylight Inclusion

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Annalise Reichert  on 

I am working on a project using the prescriptive daylighting method for achieving IEQc8.1 The project has both sidelighting and toplighting.

1
Thu Feb 27, 2014, 12:23 am

Gravel as a part of green roofs

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Alexia Anastassiadis  on 

Hi! We are working on a project that has a large green roof. Some parts of it are covered with gravel (crushed stone) as a surface to walk on.

1
Thu Feb 27, 2014, 8:09 pm

Base build pumps and fans

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Mike D  on 

Hello, If all central pumps and fans are base build, does section 3.10 of the form need to be completed? Also, does the 'Total tenant space fan and pump sizing' under section 1.4 have to be filled

1
Tue Mar 4, 2014, 11:59 pm

Combine Option 1 and Option 2?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Eleni Tsivitzi  on 

I was just wondering if anyone has attempted combining compliant SRI/shading by trees (option 1) with underground parking (option 2) for this credit.

0

Process water calculations

Healthcare-v2009 WEp1:Water use reduction
posted by  Gustavo De las Heras Izquierdo  on 

Regarding the "cycles per day" and "daily usage multiplier" columns in table WEp1-6: 1-Is there any study or guide to be used in order to populate these cells? 2-Are there any recommended ratios o

1
Mon Mar 3, 2014, 9:26 pm