Sample PI-Form 3-1 Complex Occupancy Upload

NC-2009 PIf3:Occupant and Usage Data
posted by  Jamison Hill  on 

Can someone share an example of a complex occupancy upload done in a excel that was approved by LEED.

1
Fri Feb 28, 2014, 12:35 am

Stremlined Path vs. No Energy Star Label?

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Jalal Avades  on 

If the building was awarded an Energy Star label in April 2013 with 80 points and now we are submitting for certification in January 2014 (less than a year from being awarded the label). If we foun

1
Tue Mar 11, 2014, 1:13 am

site area

EBOM-2009 PIf2:Project Summary Details
posted by  Andres Giraldo  on 

Hi, our project is classify as Industrial-manufacturing facility.

1
Thu May 22, 2014, 3:47 am

Is the bottom of the basin allowed in Open Space Calculations?

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Candice Rogers  on 

Hello - We have two landscaped detention basins on our site. Their slopes are vegetated, but exceed the 1:4 ratio.

1
Thu Mar 6, 2014, 7:38 pm

Historical Buildings with Protected Facades

ND-v2009 GIBp2:Minimum building energy efficiency
posted by  Jean Marais  on 

We are faced with the question of whether it is feasable to attempt a LEED ND certification on a German neibourhood which houses 100% historical buildings with protected facades.

1
Fri Feb 28, 2014, 6:40 pm

EAC1.5

Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelope
posted by  Maria Isabel Conde  on 

We have a project in a leed certified building. I want to know if the UA calculation only requires use the project areas or all the building areas. And we need to submit the product cut sheets?

1
Fri Mar 7, 2014, 3:48 pm

LEED V3 or V4 for LEED CS project

CS-2009 PIf1:Minimum Program Requirements
posted by  Jin Yang  on 

Hi Kemberly, I'm planning to register a LEED CS project in China that needs precertification as soon as possible.

1
Mon Mar 10, 2014, 1:52 pm

School bus stops

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Farah A.  on 

If a project is located within 1/4 mile of two school bus lines, will it earn the credit? Or must one of the lines be public? Thanks!

1
Mon Mar 3, 2014, 1:27 pm

50 foot setback

NC-2009 SSc1:Site Selection
posted by  Farah A.  on 

Do ponds need to meet the 50 ft setback? I understand small man made ponds for recreational, fire supression or stormwater retention purposes are exempt from this setback. Anyone know if these ar

1
Thu Mar 6, 2014, 12:12 am

Single Zone served by 2 HVAC systems

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Nandana Kumar  on 

Hi, In our project, a particular zone (Board Room) is being served by 2 systems: central chiller plant through an AHU & by Cassette Units.

1
Wed Mar 5, 2014, 12:19 am