Forum quick links
Partial Existing Envelope
NC-2009 EAc1:Optimize Energy Performanceposted by Clint Whitney on
I'm performing an energy model that is a renovation of an existing structure. The existing structure has a sheet metal roof, two vertical sheet metal walls, and 4" concrete slab.
IEQ 4.4 and MR 7
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Al Shadid on
Can We have wooden doors that qualify for both IEQ 4.4 and MR 7? Can you have FSC wooden doors that contain no added urea formaldehyde?
MR7 AND IEQ 4.4
NC-2009 MRc7:Certified Woodposted by Al Shadid on
Can We have wooden doors that qualify for both IEQ 4.4 and MR 7? Can you have FSC wooden doors that contain no added urea formaldehyde?
Carpool discount
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by BEE Incorporations on
We are working on a LEED CI office project located in a dense urban center with the minimum parking dedicated for the building.
5 degree deadband
NC-2009 EAp2:Minimum Energy Performanceposted by Dave Hubka on
How is ASHRAE 6.4.3.1.2 5 degree deadband interpreted? 70-75 deadband provides six temperatures in which the thermostat is "dead".
ACP for Europe regarding VOC limits and EMICODE classes?
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Francesco Allaix on
EBOM Alternative Compliance Path for Europe (2009) introduced the use of European methods (AgBB/DIBt GUT, EMICODE, Blue Angel) to verify the maximum VOC concentration in credit MR 3. Do you know if
AGMBC: Multiple Building and On-Campus Projects
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Tam Kin Hung on
Project brief: 1. The project is composed of 3 office buildings with retail podium for each of them, 1 residential building also with retail store surrounding it.
Air Locks and Negative Pressure
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Raina Tilden on
The project I am working on consists of a huge machine shop on one side of a glass wall and offices on the other side of the glass wall.
Using BD+C SSc4.1 as an EBOM IO credit
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Michael Smithing on
We're working on the EBOM certification of a building with excellent public transportation. Has anyone attempted to use SSc4.1 as an IO credit in EBOM?
Pilot Credit Closed
Pilot-Credits SSpc7:Light pollution reductionposted by Bill Swanson on
Pilot Credit Closed This pilot credit is closed to new registrations