NC-2009 IEQc8.2:Daylight and Views—Viewsposted by FABIO VIERO on
We are assessing a two stories office building composed by three main office blocks, each one connected by two greenhouse blocks hosting plants and people as a break area (non regularly occupied ar
Not all systems are implemented by the time of occupancy
NC-2009 EAc3:Enhanced Commissioningposted by Magda Aghababyan on
Dear all, Can you please advise me on a situation where the design states part of the building to be conditioned and the other part is ventilated but by the time occupancy happens the owner has de
Group certification with lockers
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Fabien Challeat on
I'm working on a factory project, consisting of 7 buildings. Among them, three are lockers buildings (I mean exclusively lockers, without any other spaces).
Process refrigerant conversion
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Jennifer Knocha on
We have a walk-in freezer and refrigerator that have CFCs in them. All the references for a conversion or phase-out plan only reference HVAC equipment.
Calculating Hazardous Glass Area
Pilot-Credits SSpc55:Bird collision deterrenceposted by ray keane on
How is the Hazardous Glass Area (HGA) calculated for each material? Is a material with a higher threat factor weighted the same as a material with a lower threat factor?
Existing Envelope for LEED v3
NC-2009 EAc1:Optimize Energy Performanceposted by Ken Pilcher on
Any help regarding the reuse of an existing building LEED simulation would be helpful. We are working on an existing building that was a warehouse and is now an office building.
run off coefficient
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Jin Park on
Hi My project site is composed of sand,gravel. How do I define the run off coefficient? Where can I get it? I'm not experienced enough to work LEED project. Might be a poor question..sorry.
Credit Template Troubles
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Glen LeComte on
I am filling out the pre-requisite template for our LEED 2009 CI project. There are only 2 Break Room Sinks for the project.
Confused by Third Party reporting tequirement of Option 3
NC-2009 EAc5:Measurement and Verificationposted by Renee Shirey on
I would love some insight on why, if going for Option 3, the whole-building water and energy usage data reporting MUST be done by a Third Party Data Source, vs. the actual Owner?
Steel coils counted as recovered/extracted?
NC-2009 MRc5:Regional Materialsposted by Jennifer Ratts on
Are steel coils counted as recovered for this credit? I have several products where steel coils are used. Does this count?