Forum quick links
New DES commissioning
NC-2009 EAc3:Enhanced Commissioningposted by Shevaun Barrie on
Hi, We are commissioning a building that will be connected to a DES that was completed in 2012, so it is considered "new".
Natural System Instead of Public Sewer.
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by JOSE R. TAGLE on
Hi everyone! We are working on previously undeveloped land project, which apply for case 1 “site with existing imperviousness 50% or less”.
No irrigation, No landscape - option 2 compliance
NC-2009 WEc1:Water Efficient Landscapingposted by Nicole Kimoto on
I'm working on a project where the existing site is 100% concrete paving. We are not providing any landscape, thus no irrigation. Does this mean we comply with option 2?
RockWool MR6
NC-2009 MRc6:Rapidly Renewable Materialsposted by Al Shadid on
Is rockwool considered a rapidly renewable material? I understand that rapidly renewable materials must be made from either plants or animals and must have a harvest cycle of 10 years or less.
2 separate CI spaces, 1 project?
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Charles Nepps on
I am working on a project where we are doing TI work on two different flloors, of the same building, for the same tenant. Can this be treated as 1 project for CI 2009 certification purposes?
Hello,
We have a previously
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Magda Aghababyan on
Hello, We have a previously developed project that does not meet the site area for protect and restore habitat.
LEED NC - Project Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by sompoche sirichote on
We are working on a project that consists of 2 buildings: office building and workshop building.
Rating System?
NC-2009 PIf2:Project Summary Detailsposted by Racha Rachwan on
I'm working on a project containing one Basement, Ground and a first floor, it is a residential building, its building footprint meets the minimum program requirement.
CO2 in tenant spaces with visual alarm system
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Jatuwat Varodompun on
It seems that scop of CS does not require CO2 sensors to be placed in tanent space.
VRP calculations for fan-powered boxes using 62MZ calc
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by tiantian zhou on
Our system has fan-powered VAV boxes. The first review comments required us to use 62MZ calc to account for local recirculation. But we have 120 AHUs and hundreds of zones.