Late involvement by CxA.
CI-2009 EAc2:Enhanced Commissioningposted by Charles Nepps on
The Owner dragged his feet and did not bring a Commissioning Agent on board until after the construction documents were complete, and construction started.
Hotel key tag system
NC-2009 EAp2:Minimum Energy Performanceposted by Nandana Kumar on
We are working on a hotel project. The guest rooms have a key tag system where the lights and AC switches off as soon as the guest removes the key from the key slot.
LEED Project Boundary for Site Prepped by Previous Project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Cassandra Coffin on
I am working on a new residence hall for a college campus and have a couple of questions in regards to the LEED project boundary. Due to multiple scheduling impacts, the site work and deep foundat
M&V plan for cold and dark shell
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Jatuwat Varodompun on
In case the system is yet designed, can CS project get the score in 5.1 and 5.2 by purely using tanant leasing agreement which has the M&V Plan as a reguirement to be responsible by tenants.
Breakdown of energy use
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Gustavo De las Heras Izquierdo on
It is required by the credit: "to document the breakdown of energy use in the building". Is it mandatory to have permanent energy meters by end use in order to meet this requirement? What other m
Exemplary Performance Compliance
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Eddie Cuevas on
I am currently working on a nonresidential project on a college campus that is seeking to obtain an EP point by implementing parking for high-occupancy vehicles.
developer owned design build project
NC-2009 EAc3:Enhanced Commissioningposted by Chris Flint Chatto on
We are working on a design-build team developing a project that will be leased to a government agency.
Sensor Type Flush Fixtures
CI-2009 WEc1:Water Use Reductionposted by Katherine Ann Resurreccion on
Hi Would Sensor activated flush fixtures like urinals and WCs have the same flow rate calulations as a sensor type flow fixture? Would it follow the default 12sec / 60 cycle?
Not Regularly occupied
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Phillip Cook on
In LEED v2009, if a project has less than 1 annualized FTE occupancy it was not possible to achieve any of the IEQ points.
Car park in basement
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mike D on
If only four car parking spaces are located within the basement of the building, will they require separate exhaust even if they are not used regularly?