Development Radius for EP

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Robert Celio  on 

We have a project in the city and can easily meet the EP requirements for Option 1.

1
Mon Mar 31, 2014, 5:31 pm

Option 1: Existing Equipment

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Steve Gross  on 

I have read Interpretation #10134 and 10135, but based on some of the comments below, I would like some additional confirmation.

1
Fri Apr 11, 2014, 5:13 pm

Naturally ventilated and heated warehouse

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Scott McMillan  on 

We seek some advice on how to demonstrate thermal comfort compliance for occupied spaces in an industrial warehouse type space in Christchurch, New Zealand.

0

Historic building.... in progress

ND-v2009 GIBc6:Historic resource preservation and adaptive use
posted by  Colin Inderwish  on 

Hello, We have a 100 yr old masonry chapel on our site that we are in the process of registering as a historic building. The process takes several months to a year.

1
Sat Mar 29, 2014, 7:50 pm

acrylic with non paper backer

Homes-v4 MRp2:Durability management
posted by  Elizabeth Eason  on 

The credit calls for non paper faced backer board behind fiberglass enclosures. Does that apply to behind acrylic surrounds also?

1
Fri Mar 28, 2014, 8:01 pm

Baseline confussion

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Mohamed Hesham  on 

i want to know what is the differences between the ipc baseline calculations ,the LEED EBOM baseline and the performance calculation, in the case i'm dealing with the building fixtures already comp

1
Mon Mar 31, 2014, 3:03 pm

LEED Canada Option 3 Public & Catholic Joint Use School

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Kelly Searle  on 

We are building a joint use school and trying to determine the likelihood of achieving 3 credits under SSc4.1 Alternative Transportation: Public Transportation Access - Option 3 (Transportation Dem

1
Mon Mar 31, 2014, 10:18 pm

Tables titles missing

ND-v2009 SLLp4:Agricultural land conservation
posted by  Andres Schwarz  on 

On the SSLp4 Credit Language section, the titles of the tables are missing.

1
Thu Apr 3, 2014, 4:02 pm

how long can be interval time between 2 parts of projects

CS-2009 MPR2:Must be a complete, permanent building or space
posted by  Catharina B  on 

Hello We are working on the project, which include 3 independent buildings: A, B & C – but for certification is one single building (each 17 stories above grade has own mechanic, energy system

0