Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Skylight coverage

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Adrienn Gelesz  on 

Hi, in case of a not meeting the skylight coverage ratio of 3-6% for the total room space, e.g.

1
Tue Apr 22, 2014, 8:29 pm

Alternate Compliance Concept - Thoughts?

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Eric Thompson  on 

We have a situation where our site only has one bus line with a stop within 1/4 mile (though 2 other stops are within 1/2 mile). However, the one bus line is very frequent and runs all day.

1
Thu May 29, 2014, 10:35 pm

Wood Cladding adhesives

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Nouran Abdel-Rahman  on 

We are applying wood cladding for the walls. To assign the cladding panels, firstly we apply wood framing to the walls then fasten the panels to them.

1
Thu Apr 17, 2014, 2:04 pm

Window Frames and Window Area

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Larry Turbes  on 

Does LEED's "window area" take into account framing or is "window area" the actual glass area (excluding framing)?

1
Thu Apr 17, 2014, 1:46 pm

Minimum Indoor Air Quality Calculation (Natural Ventilation)

NC-2009 IEQp1:Minimum IAQ Performance
posted by  JP Rout  on 

We are pursuing for Fresh Air calculations for a Building with Natural Ventilation, as per the ASHRAE 62.1-2007 requirement, stated under the IEQ Prerequisite 1 – Minimum Indoor Air Quality Perform

1
Thu Apr 17, 2014, 3:01 pm

Building Reuse off Site

Schools-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Larry Turbes  on 

Our project has two building structures that will be moved for use on another property by a different owner. One is a greenhouse, the other is a prefabricated temporary classroom building.

1
Thu Apr 17, 2014, 5:11 pm

EP Threshold for LEED-HC

NC-2009 EAc6:Green power
posted by  Paul Diaz  on 

The reference guide does not provide an EP threshold for this credit under the LEED-HC system. Does anyone know if an EP point is available at 70% or 100%?

1
Mon May 19, 2014, 6:58 pm

Illustrating Compliance using representative sampling?

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  Ryan Hoffman  on 

All, We are working with a client in a 1.2 mill. SF office building with three towers connected by a central core.

1
Mon Aug 10, 2015, 6:48 pm

Greenhouse Program

Schools-2009 IDc1:Innovation in Design
posted by  Larry Turbes  on 

The elementary school we're working on will have a greenhouse for growing primarily food products, with the aim of teaching students where food comes from and what the associated environmental/heal

1
Tue Mar 17, 2015, 5:13 pm

LEEDuser IPM template updated

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Tristan Roberts  on 

LEEDuser has updated our IPM template that is available to members in the Documentation Toolkit above.

1
Thu Dec 11, 2014, 12:04 am