Forum quick links
what defines a roof for this credit?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Erin Holdenried on
What defines a roof for this credit? Is it slope, construction, or function? I have a project with a mansard roof. It has a 65% slope, very steep.
Path 9
CI-2009 SSc1:Site Selectionposted by Mike D on
Hello, If attempting Path 9, do the fixtures of the tenant space need to be included as well or do just the ones in the base build need to be included? Many thanks!
how many plants in an industry-wide EPD?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Martha VanGeem on
How many plants have to be included in an industry wide EPD?
Thermal Comfort Controls
NC-v4 EQc5:Thermal comfortposted by Jenelle Shapiro on
If the project is meeting Thermal Comfort Design (ASHRAE 55) via zoned heating but without AC (temperate climate zone)...
Vineyards?
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Kevin Gilleran on
Can vineyards within the LEED boundary for a winery project be counted in the vegetated open space area calculations?
Maintenance Plan for ESC
NC-2009 SSp1:Construction Activity Pollution Preventionposted by JP Rout on
Is maintenance plan a mandatory requirement under ESC and what should be its content? Kindly share if any sample is available. Thanks in advance.
LEED Boundary
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by CT G on
We are working on a project that includes a building and open space surrounding it.
Minimum air flows for simulation
CS-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Hello Marcus. I have a question regarding minimum air flows for a core and shell project. the minimun cfm for the simulation must be the same in the energy model and IEQ p1 and IEQ c1.
Re: RoHS directive
Healthcare-v2009 MRc4.2:PBT source reduction - lead, cadmium and copperposted by Kai Starn on
Hello, correct me if I'm wrong but the foregoing discussion showed us that RoHS testing for lead in electrical wire and cable does not meet the credit intent.
Glass Canopy over Compliant Hardscape
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Heather DeGrella on
We have a glass canopy over a plaza with compliant hardscape. Do we have to include the glass's SRI? Does anyone know of a default SRI for glass?